Results 51 to 60 of about 65,090 (297)
All‐Polyimide‐Mediated Liquid Metal Assembly on Aerogels for Breathable and Robust Electronic Skins
An all‐polyimide‐mediated assembly strategy resolves the fundamental conflict between physiological breathability and electromechanical robustness in wearable electronics. By integrating a polyamic acid‐encapsulated liquid metal ink onto an ultralight polyimide aerogel, imidization‐induced contraction enables low‐temperature conductive activation and ...
Haijun Zhu +18 more
wiley +1 more source
Keywords: Pre-contract negotiations, civil liability, positive loss, negative loss. [PDF]
Pre-contract negotiations usually lead to the conclusion of contracts. The principle of party autonomy also applies to the preliminary stages of contract formation.
Mahdi Ghabouli dorafshan, Saeed Mohseni
doaj
We report electrochemical quantum capacitance spectroscopy as an ambient, in situ probe for defect‐mediated electronic structure at 2D material interfaces. Using monolayer MoS2, the method resolves band edges and vacancy states, tracks sulfur‐vacancy evolution during hydrogen evolution, and links interfacial density‐of‐states changes to nearly ...
Mengyu Yan +9 more
wiley +1 more source
A New Method for Contractors HSE Ranking at the Pre-Contract Stage Based on Contract Level
Background and aims: Evaluation of the contractor’s HSE is a key issue for the employer that influences the selection of a contractor. An appropriate method of assessment can play a significant role in the selection of qualified contractors. This paper
Mohammad Javad Jafari +2 more
doaj
A custom shape memory polymer material selection process relates quantitative application criteria (e.g., compression garment yarns) to material characterization information. The selected materials are manufactured into yarn geometries, which expand the design space by creating structural stress‐strain profiles beyond the nominal material stress‐strain
Michaela Andrews +2 more
wiley +1 more source
FINANCIAL OBLIGATIONS AND CONTRACT TERMINATION
Fulfillment of the contract is the main motive why the contract parties conclude contracts. When one contract party fails to fulfill its contractual obligations, then, the other contract party which sticks to the contract, could request the contract to ...
Nikola Nedeljković
doaj
The Philosophical Method of Aristotle and Thomas in Contract Law Analysis [PDF]
This article addresses the role of Aristotelian thought and method in contract analysis, and how this analytical method has transferred to modern thought through Christian theologians, especially Thomas Aquinas and late scholastics.
Abdorreza Alizadeh
doaj +1 more source
This article introduces a soft wearable eyelid sling device incorporating a hydraulic soft artificial muscle (SAM) for achieving complete closure of an eyelid. The SAM is driven by a cam mechanism that provides a displacement profile closely matched with those of a healthy eyelid.
Patrick Pruscino +7 more
wiley +1 more source
Predugovor je pravni instrument kojim se stranke obvezuju na sklapanje glavnog ugovora pod unaprijed dogovorenim uvjetima. U slučaju da jedna strana odbije ispuniti tu obvezu, druga strana može zatražiti sudsku odluku kojom se naređuje sklapanje glavnog ...
Knežević, Kristina
core +2 more sources

