Results 1 to 10 of about 227 (87)
Construction contractors significantly contribute to the progress and success of projects. Contractor prequalification grants tendering rights only to competent contractors.
Vincent F Yu, Shih-Wei Lin
exaly +3 more sources
Increasing penetration of distributed renewable energy sources (DRESs) has resulted in the emergence of distributed energy resource aggregators (DERAs). A DERA participates in the transmission-level market operated by a transmission system operator (TSO),
Hee Seung Moon +3 more
doaj +1 more source
Predicting Cost Performance of Construction Projects from Projects Procurement Procedure [PDF]
The purpose of this paper is to show by multivariate regression model if a defective procurement procedure leading to a contract award affects the smooth execution of a project in terms of its cost performance on the strength of the significance of the ...
Samuel I. Egwunatum +3 more
doaj +1 more source
The purpose of this paper is to summarize and share the field experiment results of KEPCO’s project consortium to create a TSO-DSO-DERA interaction scheme.
Jung-Sung Park, Bal-Ho Kim
doaj +1 more source
A Human Perspective of Contractor Prequalification
The contractor prequalification topic has had much written on it over the last two decades. In the past it has been primarily viewed in terms of the appropriate selection of contractors for construction projects.
Bassam Michael Baroudi, Mike Metcalfe
doaj +3 more sources
Prequalification criteria, according to the government procurement and supplies management Act, B.E. 2560 (2017): branch/type, class, right to bid, ability to carry out [PDF]
The objective of this article is to study new bidding prequalification criteria of the Royal Thai government sectors according to the Government Procurement and Supplies Management Act, B.E.
Vanborsel Boonruk, Subsomboon Kumpon
doaj +1 more source
Purpose. The aim of this work was to determine the number and type of active pharmaceutical ingredient (API) quality deficiencies in API Master Files (APIMFs) as submitted to the World Health Organization (WHO) Prequalification of Medicines Programme ...
Isabel Ortega Diego +3 more
doaj +1 more source
Robust prequalification process of a distribution system operator considering N‐1 contingency
A distributed energy resource aggregator (DERA) participates in the wholesale energy market (WEM) on behalf of aggregated distributed renewable energy sources (DRESs). The DERA manages DRESs according to the dispatch signal from the system operator (SO).
Chang Min Jeong +4 more
doaj +1 more source
Selecting an appropriate contractor is a crucial phase that clients normally conduct to execute projects. Extensive research has been conducted on the main contractor selection criteria such as financial stability and technical and management capability.
Nadeera Abdul Razak +5 more
doaj +1 more source
Performance assessment of four HIV self-test devices in South Africa: A cross-sectional study
HIV self-testing (HIVST) has been introduced to supplement existing HIV testing methods to increase the number of people knowing their HIV status.
Mohammed Majam +6 more
doaj +1 more source

