Results 91 to 100 of about 211,981 (215)
An Improved Equation for Predicting the Stress of Bonded High-Strength Strands at Flexural Failure
To achieve efficient design and ensure the safety of concrete structures, the use of high-strength concrete, reinforcing steel, and prestressing tendons has been steadily increasing.
Kyeong-Jin Sung, Jisu Hong, Se-Jin Jeon
doaj +1 more source
Report B : self-consolidating concrete (SCC) for infrastructure elements - bond, transfer length, and development length of prestressing strand in SCC. [PDF]
Due to its economic advantages, the use of self-consolidating concrete (SCC) hasincreased rapidly in recent years. However, because SCC mixes typically have decreasedamounts of coarse aggregate and high amounts of admixtures, industry members ...
Missouri University of Science and Technology
core
A Fatigue Study of Prestressing Strand
016149371983PDFTech ReportFHWA/TX-82/54+300-1, 300-13-5-80-300Cable stayed bridgesSteel bridgesGirder bridgesBridge designFatigue testsPrestressingBridge cablesprestressing strandsfatiguegirdersregression analysiscable staysBridges and other ...
core
Experimental Study on Prestressing Force of Corroded Prestressed Concrete Steel Strands
Li, Jingyuan +3 more
openaire +1 more source
Four-point bending tests were conducted on precast ultra-high-performance concrete (UHPC) segmental beams reinforced with unbonded prestressing tendons.
Youqin Zhu +4 more
doaj +1 more source
Development of novel CFRP rope structures for reinforcement and prestressing applications – Part A
Carbon-fiber-reinforced polymer (CFRP) reinforcements offer high potential for resource-efficient and durable concrete structures due to their superior tensile properties and corrosion resistance.
Paul Penzel +4 more
doaj +1 more source
Excessive Strand End Slip in Prestressed Piles
Recently, inspectors of the South Carolina Department of Transportation observed a strand end slip problem involving 610 mm (24 in.) octagonal piles being cast at the Socastee Bridge location near Conway, South Carolina. From measurements taken in the field, it is apparent that the problem of excessive initial strand slip is independent of pile shape ...
openaire +2 more sources
Bond and Material Properties of Grade 270 and Grade 300 Prestressing Strands [PDF]
The first objective of this thesis was to determine the material properties of grade 270 and grade 300 prestressing strand of various sizes. Tension tests were performed on each type of strand.
Loflin, Bryan
core
Grade 300 Prestressing Strand and the Effect of Vertical Casting Position [PDF]
The purpose of this investigation was (1) to compare the differences in the transfer length, development length, and flexural strength among Grade 300 strand, the traditional Grade 270 strand, and the predictions of these properties obtained using ...
Cousins, Thomas E. +2 more
core
Spacing and cover of epoxy coated prestressing strands.
this report summarizes a two year research effort related to spacing and concrete over requirements for epoxy coated prestressing strand. Today, prestressed concrete is widely used in the construction industry.
Cousins, Thomas E. +3 more
core

