Results 11 to 20 of about 8,458,177 (195)

Planning for Urban Heat Resilience

open access: yes, 2022
Heat is the number one weather-related killer in the United States. As average global temperatures continue to rise, the threats of both extreme heat events and chronic heat are projected to increase.
Keith, Ladd, Meerow, Sara
core   +4 more sources

Comprehensive representation of feasible combinations of alternatives for dynamic production planning using Zero-Suppressed Binary Decision Diagram

open access: yesJournal of Advanced Mechanical Design, Systems, and Manufacturing, 2014
The goal of the production-planning problem is to find the optimal solution from combinations that satisfy constraints. Traditionally, production-planning problems have been treated separately, due to the problem size and complex constraints, whereas the
Keita TAKAHASHI   +2 more
doaj   +1 more source

USE OF ARTIFICIAL INTELLIGENCE METHODS IN OPERATIONAL PLANNING OF TEXTILE PRODUCTION [PDF]

open access: yesJournal of Process Management and New Technologies, 2018
In this article, the authors analyzed the widely used methods of artificial intelligence in world practice, described the production management system.
Nuritdin Yuldoshev   +2 more
doaj   +1 more source

The methodology for calculating the apparent water absorption index from test injection data [PDF]

open access: yesE3S Web of Conferences
After the oilfield enters the medium-high water content period, the treatment problem of produced water becomes more and more prominent, and the same-well injection technology can realize the oil-water separation of the produced fluid at the well.
Li Peng
doaj   +1 more source

Production Planning Problem of a Two-Level Supply Chain with Production-Time-Dependent Products

open access: yesApplied Sciences, 2021
This study considers a production planning problem with a two-level supply chain consisting of multiple suppliers and a manufacturing plant. Each supplier that consists of multiple production lines can produce several types of semi-finished products, and
Jun-Hee Han, Ju-Yong Lee, Bongjoo Jeong
doaj   +1 more source

Energy Cost-Efficient Task Positioning in Manufacturing Systems

open access: yesEnergies, 2020
A problem to determine a production schedule which minimises the cost of energy used for manufacturing is studied. The scenario assumes that each production task has assigned constant power consumption, price of power from conventional electrical grid ...
Andrzej Bożek
doaj   +1 more source

Assembly Line Optimization Using MTM Time Standard and Simulation Modeling—A Case Study

open access: yesApplied Sciences, 2023
This study presents an approach to solving the assembly line balancing problem (ALBP) using the Methods-Time Measurement (MTM) time standard and simulation software.
Matic Breznik   +2 more
doaj   +1 more source

THE IMPACT OF ACTOR-RELATIONAL DYNAMICS ON INTEGRATED PLANNING PRACTICE [PDF]

open access: yes, 2021
Integrated planning processes involve an increasing number of actors and aim to create synergy between multiple knowledges in communicative settings. Planning research has acknowledged that the actor-relational aspects of planning processes are not yet ...
Mladenović, Miloš N.   +4 more
core   +1 more source

Mixed-Integer Linear Programming Model for Production Planning: A Case Study at Sawn Timber Production

open access: yesJurnal Teknik Industri, 2020
Sawmill industry is an industry that processes logs into sawn timber products through several processes to maximize profits and meet customer demand. The process involves important operations that has to be coordinated to get the desired product with the
Octavia Riskadayanti   +2 more
doaj   +1 more source

Production and Planning [PDF]

open access: yesNature, 1934
To the now rapidly growing number of students of monetary reform, the leading article of July 7 will appear to be profoundly unscientific.
  +5 more sources

Home - About - Disclaimer - Privacy