Pull planning versus push planning: Investigating impacts on crew performance from a location-based perspective

open access: yesFrontiers in Built Environment, 2022
Push planning and pull planning are different approaches used for production planning and control. Push planning uses predetermined dates to control a project, whereas pull planning utilizes the system’s current state.
Malek Ghanem   +4 more
doaj   +1 more source

IMPLEMENTATION OF R-TECHNIQUE IN PRODUCTION PLANNING AND CONTROL

open access: yesJournal of Engineering, 2010
The planning engineering is considered a vital part in the industrial operations series that leads to achieve the proposed production plan. Because of scientific advancement and technical development in the industrial field, the managements of the ...
Zuhair Issa Ahmed   +1 more
doaj   +1 more source

Production Planning and Control as Routing in Manufacturing Networks

open access: yesMendel, 2018
In this paper, we explore the use of network routing for production planning and control in manufacturing of complex industrial products. Such a product is the result of a joint effort of many manufacturing companies; each considered a collection of work
Terje Bach, Bjørn Jæger, Arild Hoff
doaj   +1 more source

Scheduling Parameters in Production Planning and Control [PDF]

open access: yesJournal of Systemics, Cybernetics and Informatics, 2017
Nowadays one of the most challenging tasks of producing companies is the growing complexity due to the globalization and digitalization. Especially in high wage countries, the ability to deliver fast and to a fixed date gets more and more important.
Jan Reschke, Günther Schuh
doaj  

Integrated production planning and control: A multi-objective optimization model

open access: yesJournal of Industrial Engineering and Management, 2013
Purpose: Production planning and control has crucial impact on the production and business activities of enterprise. Enterprise Resource Planning (ERP) is the most popular resources planning and management system, however there are some shortcomings and ...
Cheng Wang, Xiao-Bing Liu
doaj   +1 more source

Risk Treatment for Energy-Oriented Production Plans through the Selection, Classification, and Integration of Suitable Measures

open access: yesApplied Sciences, 2022
With rising electricity prices, industries are trying to exploit opportunities to reduce electricity costs. Adapting to fluctuating energy prices offers the possibility to save electricity costs without reducing the performance of the production system ...
Stefan Roth   +3 more
doaj   +1 more source

Numerical Analysis of Altered Parallel Flow Heat Exchanger with Promoted Geometry at Multifarious Baffle Prolongs

open access: yesEnergies
This study investigated the influence of BFFSP on the thermohydraulic performance of a SATHEC(s) using a novel computational approach. The novelty lies in the detailed exploration of the interplay between BFFSP, MFRT, and key performance parameters ...
Mehmet Akif Kartal, Ahmet Feyzioğlu
doaj   +1 more source

Conceptual framework for integrating BIM and augmented reality in construction management

open access: yesJournal of Civil Engineering and Management, 2020
The need for systematic data collection and processing to generate real-time building site progress information is critical. Building Information Modelling (BIM) provides the benefit of aggregating information about the building site on a single platform.
Ricardo L. Machado, Cesar Vilela
doaj   +1 more source

Proceedings of the Conference on Production Systems and Logistics : CPSL 2023 - 2

open access: yesProceedings of the Conference on Production Systems and Logistics, 2023
[No abstract available]
Herberger, David, Hübner, Marco
doaj   +1 more source

A Balanced Dashboard for Production Planning and Control. [PDF]

open access: yesAnnual Conference of the International Group for Lean Construction, 2017
The paper proposes a concept for a dashboard to be used as part of Last Planner based production planning and control. The dashboard is constructed to be used, not primarily by management, but by the last planners. For this reason the dashboard has to be simple (it should focus on some few but important metrics), and it has to be balanced (it should ...
Bølviken, Trond   +3 more
openaire   +1 more source