Ports '01, 2001
Port projects in the United States have historically been delivered on a design-bid-build (low bid) basis, with a few select projects being delivered on design-build basis. This paper discusses the evolving environment that favors a new method of project delivery, design-build-operate-transfer (DBOT).
openaire +1 more source
Port projects in the United States have historically been delivered on a design-bid-build (low bid) basis, with a few select projects being delivered on design-build basis. This paper discusses the evolving environment that favors a new method of project delivery, design-build-operate-transfer (DBOT).
openaire +1 more source
Project delivery systems for nZEB projects
Facilities, 2016Purpose– The paper aims to reveal the most functioning project delivery systems for nearly zero-energy building (nZEB) projects. The focus is set to reveal the qualities of the systems that support the nZEB goals and sustainability.Design/methodology/approach– Research method used in this paper is inductive reasoning. The reasoning is based on existing
Mikko Kantola, Arto Saari
openaire +4 more sources
2019
The Clean Development Mechanism (CDM) is one of three flexible emission reduction mechanisms flowing from the 1997 Kyoto Protocol [11], where certified emission reduction credits or units (commonly referred to as CERs or carbon credits) are generated in developing countries for use by industrialised countries (referred to as Annex 1 parties— [11]) in ...
openaire +1 more source
The Clean Development Mechanism (CDM) is one of three flexible emission reduction mechanisms flowing from the 1997 Kyoto Protocol [11], where certified emission reduction credits or units (commonly referred to as CERs or carbon credits) are generated in developing countries for use by industrialised countries (referred to as Annex 1 parties— [11]) in ...
openaire +1 more source
Virtual Project Delivery System Adviser
Journal of Professional Issues in Engineering Education and Practice, 2007The selection of an appropriate project delivery system (PDS) is of paramount importance to an infrastructure project, as it could affect the success of the plan in terms of time, cost, and quality. Researchers have advocated that the development and application of a systematic approach to the selection of PDS is needed.
Ng, ST, Cheung, SO
openaire +2 more sources
Boston Offender Needs Delivery Project
International Journal of Offender Therapy and Comparative Criminology, 2017To bridge a gap in access to community services for releasing state inmates, the Boston Offender Needs Delivery (BOND) project was developed as a longitudinal study (2014-2016) of adult inmates with a history of substance use and co-occurring mental health disorders returning to the community following detention in one of Massachusetts’ State ...
Leila, Salem +4 more
openaire +2 more sources
Comparative analysis between integrated project delivery and lean project delivery
International Journal of Project Management, 2019Abstract Integrated Project Delivery (IPD) and Lean Project Delivery (LPD) are innovative approaches that are capturing the attention of the construction industry. However, there is a confusion about the definitions of these approaches and how they integrate a project delivery process.
Harrison A. Mesa +2 more
openaire +2 more sources
2001
The key objective of project delivery reviews is to provide ongoing project health assessment, enabling problems to be detected early, before the project becomes troubled. Clear and crisp findings and recommendations are required. Reviewers must be experienced, senior people who are independent of, and respected by, the project team.
openaire +1 more source
The key objective of project delivery reviews is to provide ongoing project health assessment, enabling problems to be detected early, before the project becomes troubled. Clear and crisp findings and recommendations are required. Reviewers must be experienced, senior people who are independent of, and respected by, the project team.
openaire +1 more source
Project Delivery Systems for Construction Projects
Journal of the Construction Division, 1976The four basic construction systems, their definitions, relationships, characteristics, and probable completion times are presented. Also presented are advantages and disadvantages for each system. A method for systems application, which relates the various systems data to project characteristics and environment and the construction professional's ...
openaire +1 more source