Results 31 to 40 of about 1,507,852 (203)

The suitability of PRINCE2 for engineering infrastructure [PDF]

open access: yes, 2020
The view that PRINCE2 was not suitable for application to infrastructure was identified in a study done for a separate purpose, namely, to examine project governance and methodology, which is not reported in this paper.
McGrath, Stephen   +1 more
core   +2 more sources

Application of Integrated Project Delivery (IPD) in the Middle East: Implementation and Challenges

open access: yesBuildings, 2022
The Integrated Project Delivery method (IPD) is a contractual framework that features enhanced collaboration, risk and reward sharing under a single contract among the major project parties.
Mohamed Sherif   +2 more
doaj   +1 more source

Decision-Making for Project Delivery System in Construction Projects Based on SWARA-TOPSIS Methods

open access: yesTikrit Journal of Engineering Sciences
The owner of construction projects often faces difficulty choosing the appropriate project delivery system. The construction project’s owner must choose a suitable project delivery system throughout the project's early decision-making stages.
Mohammed Neamah Ahmed   +2 more
doaj   +1 more source

Key Success Factors of PRINCE2 Project Management Method in Software Development Project

open access: yesInternational Journal of Engineering Materials and Manufacture, 2020
Project management uses many tools, techniques, and methodologies in project development. PRINCE2 methodology set documentation which must be tailored to suit the occasion project.
Saiful Islam, Nina Evans
doaj   +1 more source

Structured Literature Review of Design-Build/Bridging, Design-Bid-Build & Design-Build [PDF]

open access: yes, 2018
This paper is a systematic literature review of journal papers and articles on the three project delivery systems (PDS), design-build/bridging (bridging), design-bid-build (DBB) and design-build (DB).
Chugh, Karan, Fernandez-Solis, Jose L.
core  

The unanticipated challenges associated with implementing an observational study protocol in a large scale physical activity and GPS data collection [PDF]

open access: yes, 2018
Background: Large-scale primary data collections are complex, costly, and time-consuming. Study protocols for trial-based research are now commonplace, with a growing number of similar pieces of work being published on observational research.
Ellaway, Anne   +2 more
core   +1 more source

Soft Elements in Collaborative Project Delivery Methods [PDF]

open access: yesAnnual Conference of the International Group for Lean Construction, 2019
Lean construction seeks to improve project performance through maximizing value and reducing waste. As a way of improving project performance, collaborative project delivery methods have been presented as a potential solution. The foundation of collaborative PDM is that they seek to align all participants to well understood and agreed on project goals.
Engebø, Atle   +2 more
openaire   +2 more sources

Assessment of Citizen Perception: A Case Study of Municipal Solid Waste Management System in Guimaraes, Portugal

open access: yesJISR Management and Social Sciences & Economics, 2021
This study explores a new method of service delivery in the public sector in Guimaraes, which is the UNESCO Heritage Centre. The primary reason for this effort is the paradigm shift in the public service sector, which has resulted in improved services ...
M. Irfanullah Arfeen   +3 more
doaj   +1 more source

The key performance indicators of the BIM implementation process [PDF]

open access: yes, 2010
Contemporarily some firms in the construction industry are attempting to adopt a BIM method of working. Each of these attempts reflects a varying BIM adoption philosophy and inevitably different BIM technologies, implementation strategies and roadmaps ...
Arayici, Y   +5 more
core  

Design project planning, monitoring and re-planning through process simulation [PDF]

open access: yes, 2009
Effective management of design schedules is a major concern in industry, since timely project delivery can have a significant influence on a company’s profitability.
Clarkson, PJ, Wynn, DC
core  

Home - About - Disclaimer - Privacy