Results 151 to 160 of about 1,744,479 (197)
Some of the next articles are maybe not open access.
Block-Build: A Decentralized Project Delivery Method
SSRN Electronic Journal, 2018Construction Method of Project Delivery using blockchain technology and smart contracts. The construction industry is in desperate need of evolving with technology and reduced costs, block-build has the ability to do just that and much more.
openaire +1 more source
Selecting project delivery methods for water treatment plants
Engineering, Construction and Architectural Management, 2019PurposeThe purpose of this paper is to identify key project delivery method selection factors to assist water industry decision-makers in selecting the most appropriate delivery method for their water treatment plant projects.Design/methodology/approachThe selection factors were identified by compiling and validating key project delivery selection ...
Jeffrey Feghaly +3 more
openaire +1 more source
Appropriate Housing Project Delivery Methods Using AHP
In the pursuit of identifying the most effective approach for housing project delivery, a meticulously crafted model leveraging the Analytical Hierarchy Process (AHP) has been developed. This model serves as a crucial tool for systematically evaluating and ranking various housing delivery methods based on critical variables pivotal to the selection ...Pasi, Kunal +2 more
openaire +2 more sources
Selecting the appropriate project delivery method using AHP
International Journal of Project Management, 2002Abstract A model using the analytical hierarchy process (AHP) is developed to select the most appropriate project delivery method. Several factors considered to be relevant to the selection decision are used in the ranking of the project delivery methods.
openaire +1 more source
Communication issues in design-build project delivery method
2015Design-Build (D-B) is a project delivery method in which the owner procures both design and construction services in the same contract from a single legal entity referred to as the design-builder. Having both design and construction in the hands of one contractual entity allows for a single point of responsibility and, in turn, provides improved ...
Faught, Allen, Tran, Daniel
openaire +1 more source
Planning for post‐pandemic cancer care delivery: Recovery or opportunity for redesign?
Ca-A Cancer Journal for Clinicians, 2021Pelin Cinar +2 more
exaly

