Results 101 to 110 of about 1,266,934 (265)
Biophysical characterisation shows that NanX, a membrane transport protein from the major facilitator superfamily (MFS), forms both monomers and dimers after purification. AlphaFold modelling and substrate docking provide information on residues likely involved in substrate recognition for NanX and another MFS member, NanT.
Michael C. Newton‐Vesty +13 more
wiley +1 more source
A ship-construction dataset for resource leveling optimization in large project management problems. [PDF]
Kyriklidis C, Dounias G.
europepmc +1 more source
The presence of biotin‐binding avidin proteins in fish and their biological significance are poorly characterized. We cataloged fish avidins and demonstrate that they are widely present and evolutionarily conserved. We created avd knockout zebrafish and show that zebavidin is dispensable for development and that resistance of avd knockout embryos in ...
Anni K. Saralahti +5 more
wiley +1 more source
Retracted: The Influence Mechanism of BIM on Green Building Engineering Project Management under the Background of Big Data. [PDF]
And Biomechanics AB.
europepmc +1 more source
This systematic review synthesizes prognostic models for survival and recurrence in resected non‐small cell lung cancer. While many models demonstrate moderate to good discrimination, few are externally validated and reporting quality is variable, limiting clinical applicability and highlighting the need for robust, transparent model development ...
Evangeline Samuel +4 more
wiley +1 more source
Retracted: Blockchain Information Sharing Mechanism Based on Embedded System in Project Management System. [PDF]
Neuroscience CIA.
europepmc +1 more source
A Dataset of Stakeholder Networks for Project Performance Analysis
This paper shares network data gathered through questions tailored to social network analysis and project management, specifically for construction projects.
Stephen Ong, Shahadat Uddin
doaj +1 more source
This prospective study demonstrates that laparoscopic sphincter‐preserving surgery is feasible for elderly patients. While overall survival reaches 70% at 5 years, advanced T‐stage and the omission of neoadjuvant therapy significantly drive recurrence, highlighting the need for personalized geriatric protocols despite logistical challenges.
Huu Duc Ho +4 more
wiley +1 more source
Potential features of building information modeling (BIM) for application of project management knowledge areas in the construction industry. [PDF]
Raza MS +3 more
europepmc +1 more source
This research studies the competencies of International Development (ID) project managers from their perspectives, taking into consideration the contextual factors and the challenges that they face when managing ID projects. The study adopts a constructionist ontological viewpoint and an interpretivist epistemological philosophical assumption.
Adams, Brent Michael, Tran, Thi Bich Van
openaire +1 more source

