Online technological STEM education project management. [PDF]
Shen F +4 more
europepmc +1 more source
Multidimensional Profiling of MRI‐Negative Temporal Lobe Epilepsy Uncovers Distinct Phenotypes
ABSTRACT Objective Although hippocampal sclerosis (TLE‐HS) represents the most frequent cause of temporal lobe epilepsy (TLE), up to 30% of patients show no lesion on visual MRI inspection (TLE‐MRIneg). These cases pose diagnostic and therapeutic challenges and are underrepresented in surgical series.
Alice Ballerini +28 more
wiley +1 more source
Competitive advantages of organizational project management maturity: A quantitative descriptive study in Australia. [PDF]
Huang G, Lee SM, Clinciu DL.
europepmc +1 more source
Location‐Specific Hematoma Volume Predicts Early Neurological Deterioration in Supratentorial ICH
ABSTRACT Objective Early neurological deterioration (END) adversely affects outcomes in patients with intracerebral hemorrhage (ICH). This study aimed to determine the location‐specific hematoma volumes for END in supratentorial ICH patients. Methods We retrospectively analyzed supratentorial ICH patients presenting from two prospective cohorts.
Zuoqiao Li +10 more
wiley +1 more source
Lean project management in large scale industrial project via standardization
Lean project management is the comprehensive adaption of other lean concept like lean construction, lean manufacturing and lean thinking into project management context.
Karim, Azharul, Nekoufar, Saviz
core
In Digital Project Management – Strategic Theory and Practice, the authors emphasize the importance of maintaining rigor and depth while leveraging digital tools to address traditional challenges such as cost overruns and time constraints.
core +1 more source
A ship-construction dataset for resource leveling optimization in large project management problems. [PDF]
Kyriklidis C, Dounias G.
europepmc +1 more source
ABSTRACT Objectives Retrograde trans‐synaptic degeneration (rTSD) from posterior visual pathway lesions in multiple sclerosis (MS) is characterized by hemi‐macular ganglion cell‐inner plexiform layer (GCIPL) thinning and contralateral visual field loss.
Abdul Jaber Tayem +17 more
wiley +1 more source
Sustainable project management through project control in infrastructure projects
<p>Sustainability is becoming increasingly important in the delivery of projects as stakeholders require ethicality, eco-friendliness, and economic efficiency during a project's life cycle. Previous studies focused on the environmental aspects
Vuorinen, Lauri +5 more
core +1 more source
Retracted: The Influence Mechanism of BIM on Green Building Engineering Project Management under the Background of Big Data. [PDF]
And Biomechanics AB.
europepmc +1 more source

