Results 271 to 280 of about 29,777 (294)
Some of the next articles are maybe not open access.
Portfolio based approach to project risk management
2005Risk can be understood as the remaining potential of negative deviation to the business objective. Modern Risk management should provide a tool to describe the whole risk-situation of a company. Particularly, contractors active in the field of geotechnical engineering should not overstress their corporate project risk portfolio.
Nußbaumer Manfred +1 more
openaire +1 more source
Project Management Journal, 2014
Project risk management aims at reducing the likelihood of project failure. To manage risk in project portfolios, research suggests adopting a perspective that is wider than the individual project risk. The results from a hierarchical multiple regression analysis on a sample of 177 project portfolios suggest that formal risk management at the project ...
Juliane Teller +2 more
openaire +1 more source
Project risk management aims at reducing the likelihood of project failure. To manage risk in project portfolios, research suggests adopting a perspective that is wider than the individual project risk. The results from a hierarchical multiple regression analysis on a sample of 177 project portfolios suggest that formal risk management at the project ...
Juliane Teller +2 more
openaire +1 more source
Assessing project portfolio risk via an enhanced GA-BPNN combined with PCA
Engineering Applications of Artificial Intelligence, 2023Libiao Bai, Xinyu Zhou
exaly
Assessing project portfolio risk based on Bayesian network
2014 IEEE International Conference on Systems, Man, and Cybernetics (SMC), 2014Dujuan Guan +3 more
openaire +1 more source
Selecting projects in a portfolio using risk and ranking
2011There are three dimensions in project management: time, cost and performance. Risk is a characteristic related to the previous dimensions and their relationships. A risk equation is proposed based on the nature of the uncertainty associated to each dimension as well as the relationship between the uncertainties.
openaire +1 more source
A Method for Risk Response Planning in Project Portfolio Management
Project Management Journal, 2020Amir Ahmadi-Javid +2 more
exaly
Project portfolio risk analysis with the consideration of project interdependencies
Engineering, Construction and Architectural Management, 2023Libiao Bai +2 more
exaly
Risk-free planning method of the portfolio projects
2012В статті розроблений метод планування портфелів проектів, в процесі якого мінімізується загальний ризик портфелю проектів.
openaire +1 more source

