Project scheduling under undertainty – survey and research potentials. [PDF]
The vast majority of the research efforts in project scheduling assume complete information about the scheduling problem to be solved and a static deterministic environment within which the pre-computed baseline schedule will be executed. However, in the
Herroelen, Willy, Leus, Roel
core
Multimode Oxide‐Based Optoelectronic Memtransistor for In‐Sensor Vision Processing
A multimode optoelectronic memtransistor (OEMT) is demonstrated for vision explainable artificial intelligence (VXAI) hardware. By integrating optical sensing, electrical masking, and non‐volatile memory, the device enables key operations required for generating saliency information.
Min Gu Lee +10 more
wiley +1 more source
Proactive-reactive procedures for robust project scheduling. [PDF]
The vast majority of research efforts in project scheduling concentrates on developing procedures to generate workable baseline schedules that minimize the project makespan in a deterministic environment.
Van de Vonder, Stijn
core
Memristive‐Gated RC‐Delay Synaptic Transistors for Time‐Encoded Analog in‐Memory Computing
A Memristive‐Gated Transistor for Time‐Encoded Analog In‐Memory Computing — By exploiting the RC delay of a self‐rectifying interface‐type memristor, nonlinear I–V distortion is structurally bypassed, enabling 3‐bit nonvolatile memory, spike‐timing‐based analog encoding, and hardware‐calibrated reservoir‐computing validation within a unified device ...
Yun‐Seo Shin +7 more
wiley +1 more source
Models for robust resource allocation in project scheduling. [PDF]
The vast majority of resource-constrained project scheduling efforts assumes complete information about the scheduling problem to be solved and a static deterministic environment within which the pre-computed baseline schedule will be executed.
Herroelen, Willy, Leus, Roel
core
Towards automated progress tracking of erection of concrete structures [PDF]
One of the main criticisms of the construction industry is that projects are too often completed behind schedule (and/or with cost overruns). Schedule delays may result from poor planning, but also from poor progress control, because, if progress ...
Bosche, Frederic Nicolas +3 more
core
Cell therapies typically rely on cold‐chain logistics and cryopreservation, limiting access and compromising cell quality. Here, a dual‐chamber device separates an oxygen‐supplying chamber from a hyaluronic acid cargo chamber, sustaining oxygen delivery for over 70 h and enabling ambient‐temperature shipment.
Daniel A. Domingo‐Lopez +9 more
wiley +1 more source
In response to the difficulties in multi-disciplinary coordination, the complexity of schedule management, and the weakness of risk control in the construction of high-voltage substations, and based on the current construction status and historical ...
Xiaoping Shen +6 more
doaj +1 more source