Results 91 to 100 of about 65,763 (289)
ABSTRACT Globalisation has deepened the integration of international production within global value chains (GVCs), where the various stages of the manufacturing process are dispersed across countries. In today's volatile business environment, characterised by rapid technological advances (Industry 4.0) and evolving consumer preferences towards use ...
Javier Bilbao‐Ubillos +3 more
wiley +1 more source
Aerobrake assembly with minimum Space Station accommodation [PDF]
The minimum Space Station Freedom accommodations required for initial assembly, repair, and refurbishment of the Lunar aerobrake were investigated.
Butler, David H. +4 more
core +1 more source
Platform Business Model Innovation for Sustainability: A Framework for Industry 5.0 Integration
ABSTRACT A comprehensive framework is developed for adopting Platform Business Model Innovation (PBMI) to enhance sustainable performance in the Industry 5.0 (I5.0) era. While PBMI plays a growing role in corporate transformation, tensions persist between profit‐driven objectives and broader sustainability imperatives.
Mohamed Ashmel Mohamed Hashim +3 more
wiley +1 more source
The planning office in Stockholm is currently working on a new mixed-use master plan for the rundown industrial site in Vinsta, Stockholm. Looking at how similar developments are executed, there is reason to believe that a large part of the building stock will be demolished.
openaire +1 more source
Experiments for Satellite and Material Recovery from Orbit. Volume III - Experiment Missions Final Report [PDF]
Experiment missions for OSO satellite rendezvous, capture, material recovery, refurbishment, and extravehicular operation ...
Easterly, V. L., Roach, J. R.
core +1 more source
A comparison of bearing life in new and refurbished railway axle boxes [PDF]
A simple linear dynamical model shows that at normal running speeds of freight wagons, forced oscillations due to periodic track compliance are transferred to the overlying unsprung mass and significantly amplified. Due to these oscillations, a small gap
Broadbridge, P., Wake, G.
core
Impact Measuring in Sustainable Ventures: A Process Perspective
ABSTRACT Impact measurement is crucial for sustainable ventures to quantify their contribution to sustainable development. Although research has highly focused on impact measurement as a static activity, we conduct a qualitative study to explore how impact measuring as a process unfolds over time.
Jan Moellmann +2 more
wiley +1 more source
How Can the Circular Economy Contribute to Resolving Social Housing Challenges?
The construction sector stands as the predominant consumer of cement, steel, and plastic and is accountable for a substantial 55% of industrial carbon emissions.
Fernanda Paes de Barros Gomide +2 more
doaj +1 more source
This paper presents work undertaken as part of the European H2020 project OptEEmAL (Optimized Energy Efficient Design Platform for Refurbishment at District Level), toward development of a decision-support platform for building and district refurbishment
Luciano De Tommasi +5 more
doaj +1 more source
Investment vs. refurbishment: Examining capacity payment mechanisms using mixed complementarity problems with endogenous probability [PDF]
Capacity remuneration mechanisms exist in many electricity markets. Capacity mechanism designs do not explicitly consider the effects of refurbishment of existing generation units in order to increase their reliability.
Devine, Mel T., Lynch, Muireann Á.
core

