Results 41 to 50 of about 3,516,962 (261)

Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado

open access: yes, 1992
This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch.

core   +1 more source

300-FF-1 remedial design report/remedial action work plan

open access: yes, 1997
The 300 Area has been divided into three operable units 300-FF-1, 300-FF-2, and 300-FF-5 all of which are in various stages of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) process. The 300-FF-1 Operable Unit,
Gustafson, F.W.
core   +1 more source

Providing remedial support to primary school learners within their zone of proximal development

open access: yesSouth African Journal of Childhood Education, 2019
Background: One of the methods receiving the current attention in addressing poor performance and low learning achievements among lower primary school learners is through remedial teaching.
Simon G. Taukeni
doaj   +1 more source

K basins interim remedial action health and safety plan [PDF]

open access: yes, 1999
The K Basins Interim Remedial Action Health and Safety Plan addresses the requirements of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as they apply to the CERCLA work that will take place at the K East and K West ...
Day, P. T.
core   +1 more source

Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Volume 2, Appendices D and E: Final report

open access: yes, 1992
This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch.

core   +1 more source

Implementation of Lean Concepts Using Quality Tools to Reduce Waste of Product Defects

open access: yesInternational Journal of Technology, 2014
The implementation of lean concepts is to reduce or eliminate the wastes that occur during production process. One common form of waste that occurs frequently is waste caused by product defects.
Rahmat Nurcahyo, P. Heru Kristihatmoko
doaj   +1 more source

Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Gunnison, Colorado. Attachment 4, Water resources protection strategy: Final report

open access: yes, 1992
To achieve compliance with the proposed US Environmental Protection Agency (EPA) groundwater protection standards the US Department of Energy (DOE) proposes to meet background concentrations or the EPA maximum concentration limits (MCLS) for hazardous ...

core   +1 more source

From patient advocacy to patient‐driven research: Building active partnerships beginning at the bench to reach the bedside

open access: yesFEBS Open Bio, EarlyView.
Research is strongest when conducted alongside patients, not just about them. Patient research organizations help integrate patient perspectives into research priorities, study design, and scientific meetings, leading to meaningful patient outcomes and development of relevant therapies.
Jenica H. Kakadia   +9 more
wiley   +1 more source

Final audit report of remedial action construction at the UMTRA project site Rifle, Colorado. Rev. 1

open access: yes, 1997
This final audit report summarizes the assessments performed by the U.S. Department of Energy (DOE) Environmental Restoration Division (ERD) and its Technical Assistance Contractor (TAC) of remedial action compliance with approved plans, specifications ...

core   +1 more source

New Pump and Treat Facility Remedial Action Work Plan for Test Area North (TAN) Final Groundwater Remediation, Operable Unit 1-07B [PDF]

open access: yes, 2003
This remedial action work plan identifies the approach and requirements for implementing the medical zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Engineering and Environmental Laboratory (INEEL).
Vandel, D.
core   +1 more source

Home - About - Disclaimer - Privacy