Results 111 to 120 of about 3,393,189 (309)

A Resource-Efficient Edwards25519 Point Multiplication Technique for Resource-Constrained Devices

open access: yesIEEE Access
Implementing elliptic curve point multiplication (ECPM), the core operation in elliptic curve cryptography (ECC), on microcontrollers is challenging due to limited processing power and memory, restricting its application in environments like embedded ...
Nawras H. Sabbry, Alla Levina
doaj   +1 more source

OntOMat: Toward Ontology‐Based Product and Process Design Engineering and Optimization Solutions Fueling Circular Value Chains

open access: yesAdvanced Engineering Materials, EarlyView.
The OntOMat ontology establishes a structured framework for polymer matrix fiber reinforced composite materials, integrating manufacturing processes, characterization methods, and multiscale design through the VDI/VDE 3682 formalized process description standard.
Nicolas Christ   +19 more
wiley   +1 more source

An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations. [PDF]

open access: yes
In this paper, we study the resource-constrained project scheduling problem (RCPSP) with discounted cash flows and generalized precedence relations (further denoted as RCPSPDC-GPR).
De Reyck, B, Herroelen, Willy
core  

Semantic Modeling in Materials Science and Engineering With Platform MaterialDigital Core Ontology 3.0

open access: yesAdvanced Engineering Materials, EarlyView.
The community‐driven Platform MaterialDigital Core Ontology (PMDco) 3.0 is introduced as a Basic Formal Ontology‐aligned semantic backbone for the processing–structure–properties paradigm in Materials Science and Engineering. Modular engineering, automated releases, and validation workflows are highlighted and key semantic patterns for materials ...
Markus Schilling   +15 more
wiley   +1 more source

Quantization of MobileNetV2 for Resource-Constrained Microcontrollers

open access: yes
The proliferation of IoT and edge computing devices demands for efficient deployment strategies due to their limited computational capabilities and energy constraints. This paper investigates the application of deep learning models in such resource-constrained environments, focusing on the quantization of the MobileNetV2 architecture. We evaluate three
Lazzaroni L.   +4 more
openaire   +2 more sources

Non‐Additive Criteria Assessment in Sustainability Evaluation of High Entropy Alloys: A Toxicity‐Weighted Framework

open access: yesAdvanced Engineering Materials, EarlyView.
Sustainability assessment requires methodologies that appropriately distinguish between additive and non‐additive material properties. A toxicity‐weighted scoring system is developed and applied that accounts for the disproportionate influence of highly toxic constituents through nonlinear weighting functions, providing more realistic estimates than ...
Seth Mehalic   +2 more
wiley   +1 more source

Models for robust resource allocation in project scheduling. [PDF]

open access: yes
The vast majority of resource-constrained project scheduling efforts assumes complete information about the scheduling problem to be solved and a static deterministic environment within which the pre-computed baseline schedule will be executed.
Herroelen, Willy, Leus, Roel
core  

Prioritizing urban green spaces in resource constrained scenarios

open access: yesResources, Environment and Sustainability
Urban Green Space management requires a multi-dimensional, evidence-based approach to effectively balance social, environmental, and economic objectives.
Mihir Rambhia   +4 more
doaj   +1 more source

Entropy‐Driven Design of Low‐Melting‐Point Alloys via Compositionally Complex Strategy

open access: yesAdvanced Engineering Materials, EarlyView.
Conventional low‐melting‐point alloys (LMPAs) are limited by a narrow compositional space and inherent property trade‐offs. This review presents an entropy‐driven design strategy that overcomes these limitations, ushering in a new class of low‐melting‐point compositionally complex alloys (LMCCAs).
Yinghui Shang   +6 more
wiley   +1 more source

The complexity of generating robust resource-constrained baseline schedules. [PDF]

open access: yes
Robust scheduling aims at the construction of a schedule that is protected against uncertain events. A stable schedule is a robust schedule that will change little when variations in the input parameters arise.
Herroelen, Willy, Leus, Roel
core  

Home - About - Disclaimer - Privacy