Results 121 to 130 of about 4,009 (156)
Some of the next articles are maybe not open access.
Logistic planning of rework with deteriorating work-in-process
International Journal of Production Economics, 2004Simme Douwe P Flapper, Ruud H Teunter
exaly
Planning and control of rework in the process industries: A review
Production Planning and Control, 2002Simme Douwe P Flapper +2 more
exaly
Incorporating rework into construction schedule analysis
Automation in Construction, 2011Tarek Hegazy, Moustafa Kassab
exaly
Rework in Malaysian building construction: impacts, causes and potential solutions
Journal of Engineering, Design and Technology, 2017Jeffrey Boon Hui Yap, Chen Wang
exaly
Rework and schedule performance
Engineering, Construction and Architectural Management, 2014Bon-Gang Hwang
exaly
Optimal batch sizing in a multi-stage production system with rework consideration
European Journal of Operational Research, 2008Bhaba R Sarker
exaly

