A study on designing task priority rule considering rework risk of system development project
This paper proposes a methodology for designing task priority rule considering rework risk of system development project. In this paper, a process simulation considering reworks and the methodology for calculating optimal task priority rule by using ...
Taiga MITSUYUKI +6 more
doaj +1 more source
E-COCOMO: The Extended COst Constructive MOdel for Cleanroom Software Engineering [PDF]
Mistakes create rework. Rework takes time and increases costs. The traditional software engineering methodology defines the ratio of Design:Code:Test as 40:20:40.
Hitesh KUMAR SHARMA
doaj
A Single-Stage Manufacturing Model with Imperfect Items, Inspections, Rework, and Planned Backorders
Each industry prefers to sell perfect products in order to maintain its brand image. However, due to a long-run single-stage production system, the industry generally obtains obstacles.
Chang Wook Kang +4 more
doaj +1 more source
Rework continues to be a critical issue in construction projects, contributing to cost escalation, schedule delays, and compromised quality. While earlier studies have identified isolated causes such as design deficiencies, communication failures, and ...
Murat Gunduz +2 more
doaj +1 more source
The latent causes of rework in floating production storage and offloading projects
There is growing demand for cost effective and reliable floating production systems to maximize marginal and new deepwater fields worldwide. Floating Production Storage and Offloading (FPSO) vessels are considered to be the most economical and viable ...
Peter E. D. Love +3 more
doaj +1 more source
Research on the Rework Strategies of RMS Based on Process Reliability
Rework Strategies are indispensable in order to improve the process reliability of reconfigurable manufacturing system (RMS). Process reliability is an integrated measurement of production ability of RMS, which serves as a performance indicator of the ...
W. Dai, J. An, Y. Zhao
doaj +1 more source
Modeling Critical Rework Factors in the Construction Industry: Insights and Solutions
Construction professionals recognize rework’s negative impact on project performance, yet a comprehensive understanding of its critical factors still needs to be provided.
Gulden Gumusburun Ayalp, Fatma Arslan
doaj +1 more source
FAKTOR-FAKTOR PENYEBAB REWORK PADA PEKERJAAN KONSTRUKSI
Rework cannot be separated from construction projects. The direct and indirect cost resulting from it are quite significant. This research aims to identify the causes of rework and to propose effective ways to reduce it.
Andi Andi +2 more
doaj
Testimonials About Damages in Construction Resulting in Need for Rework – Cases in Sweden - Part 2
This is a study about damage resulting in rework in residential construction in Sweden. They are assorted under 13 headings that mention physical facts without taking a position on cause of the problem. This second part of the report presents information
Björk Folke +3 more
doaj +1 more source
Rework in civil construction projects at design phase: Influencing factors and suggested solutions
Among the various project phases, the design phase often contains errors that result in rework in civil construction projects. This rework can lead to budget overruns, schedule delays, and a decline in construction quality.
Van Tuan Cao +2 more
doaj +3 more sources