Results 1 to 10 of about 1,471,752 (332)

Deng Entropy Weighted Risk Priority Number Model for Failure Mode and Effects Analysis [PDF]

open access: goldEntropy, 2020
Failure mode and effects analysis (FMEA), as a commonly used risk management method, has been extensively applied to the engineering domain. A vital parameter in FMEA is the risk priority number (RPN), which is the product of occurrence (O), severity (S),
Haixia Zheng, Yongchuan Tang
doaj   +7 more sources

Fuzzy risk priority number assessment to detect midsole product defects

open access: diamondJurnal Sistem dan Manajemen Industri, 2022
The quality of midsole products significantly impacts the quality, durability, and comfort of the users of shoe products manufactured by ABC company. The high percentage of the average number of product defects based on product yield data for 12 months ...
Erni Krisnaningsih   +3 more
doaj   +4 more sources

Risk Assessment Based on Total Efficient Risk Priority Number Using Data Envelopment Analysis [PDF]

open access: greenمدیریت صنعتی, 2021
Objective: Risk management in organizations is a major process, one of the sub-processes of which is the risk assessment. The simplest assessment methods have introduced risk as a function of the probability of occurrence and the severity.
Jafar Gheidar-Kheljani, Saeed Roshandel
doaj   +3 more sources

A human error risk priority number calculation methodology using fuzzy and TOPSIS grey [PDF]

open access: goldOpen Mathematics, 2022
In the implementation of management error proofing, enterprises need to carry out risk evaluation and ranking of management activities error, to determine error proofing improvement order.
Wang Xiaochuan
doaj   +4 more sources

Fuzzy analytic hierarchy process-based risk priority number for risk assessments of commissioning process of a ring gantry LINAC. [PDF]

open access: goldJ Appl Clin Med Phys, 2022
AbstractPurposeWe propose a fuzzy analytic hierarchy process (AHP)‐based risk priority number (RPN) method in failure modes and effects analysis (FMEA) to overcome the shortcomings of traditional RPN‐based FMEA. Our research group has previously published the FMEA to mitigate the failure modes (FMs) for the commissioning process of a ring gantry LINAC.
Chang J, Jang S, Lalonde R, Huq SM.
europepmc   +4 more sources

Revised risk priority number in failure mode and effects analysis model from the perspective of healthcare system

open access: goldInternational Journal of Preventive Medicine, 2018
Background: Methodology of Failure Mode and Effects Analysis (FMEA) is known as an important risk assessment tool and accreditation requirement by many organizations.
Fatemeh Rezaei   +4 more
doaj   +3 more sources

A Novel Intuitionistic Fuzzy Set-Based Risk Priority Number Method for Solving Chemical Experiment Risk Evaluation

open access: goldSystems
Scientific experiments cover a wide range of fields—from basic to applied scientific research. Chemical experiments are the basis for cultivating chemical knowledge in scientific experiments and are an important way to cultivate scientific thinking and ...
Hsiang-Yu Chung   +2 more
doaj   +3 more sources

AMWRPN: Ambiguity Measure Weighted Risk Priority Number Model for Failure Mode and Effects Analysis

open access: goldIEEE Access, 2018
The relative importance of each risk factor in failure mode and effects analysis (FMEA) should be addressed properly. Intuitively, in the assessments coming from the FEMA experts, there exists a potential judgement on which risk factor has a higher ...
Yongchuan Tang   +2 more
doaj   +4 more sources

Risk Priority Number using FMEA by the Plastic Moulding Machine [PDF]

open access: bronzeJournal of the Korean Society of Safety, 2015
Plastic injection moulding machine is widely used for many industrial field. It is classified into mandatory safety certification machinery in Industrial Safety and Health Act because of its high hazard. In order to prevent industrial accidents by plastic injection moulding machine, it is necessary for designer to identify hazardous factors and assess ...
Woonchul Shin, Jongmin Chae
openalex   +2 more sources

RISK PRIORITY NUMBER ESTIMATION USING INTUITIONISTIC-FUZZY NUMBERS IN POWER ENGINEERING [PDF]

open access: yesJournal of Sustainable Energy, 2015
This paper considers the evaluation of the Risk Priority Number (RPN) for FMEA approaches. There are presented the traditional RPN method, and existing fuzzy logic based methods.
ALBEANU G., POPENTIU-VLADICESCU FL.
doaj   +1 more source

Home - About - Disclaimer - Privacy