Results 111 to 120 of about 32,228 (162)

Santander. Balance investigador

open access: yes, 2005
Alvargonzález Rodríguez, Ramón María   +1 more
openaire   +1 more source

Santander Bay’s Footbridge

Structural Engineering International, 2014
This footbridge is formed by a balcony beam, 70,7 m long, fixed to two abutments at its ends. The full length of the footbridge including both white wall accesses is 267,5 m.
Marcos J. Pantaleón   +2 more
openaire   +2 more sources

Home - About - Disclaimer - Privacy