Results 211 to 220 of about 389,954 (258)
Some of the next articles are maybe not open access.
Related searches:
Related searches:
Structural Engineering International, 2014
This footbridge is formed by a balcony beam, 70,7 m long, fixed to two abutments at its ends. The full length of the footbridge including both white wall accesses is 267,5 m.
Marcos J. Pantaleón +2 more
openaire +2 more sources
This footbridge is formed by a balcony beam, 70,7 m long, fixed to two abutments at its ends. The full length of the footbridge including both white wall accesses is 267,5 m.
Marcos J. Pantaleón +2 more
openaire +2 more sources
Cities, 1989
Abstract This article examines the planning process in Spain, with particular reference to the development of a general plan for Santander. Spanish planning is characterized by the fact that planning drafts are submitted to public debate before being finalized. The general plan for Santander was based on nine planning alternatives, which were derived
Javier de Mesones, Adriana Dal Cin
openaire +1 more source
Abstract This article examines the planning process in Spain, with particular reference to the development of a general plan for Santander. Spanish planning is characterized by the fact that planning drafts are submitted to public debate before being finalized. The general plan for Santander was based on nine planning alternatives, which were derived
Javier de Mesones, Adriana Dal Cin
openaire +1 more source

