Results 11 to 20 of about 54 (47)

Building Information Modeling Deployment in Oil, Gas and Petrochemical Industry: An Adoption Roadmap [PDF]

open access: yesCivil Engineering Infrastructures Journal, 2021
The implementation of Building Information Modeling (BIM) in the Architecture, Engineering and Construction (AEC) industry is growing rapidly. The Oil, Gas and Petrochemical industry (OGPi), however, is still lagging in harnessing the BIM capabilities ...
Javad Majrouhi Sardroud   +4 more
doaj   +1 more source

Characteristics of the elements of the science education curriculum based on the STEAM method [PDF]

open access: yesفصلنامه نوآوری‌های آموزشی, 2022
The aim of this research was to study the characteristics of the elements of the sixth grade primary school science curriculum based on the STEAM method. This study was conducted in the academic year 1399-1400 with a qualitative approach and the directed
Maryam Asghari Asl Sardroud   +3 more
doaj   +1 more source

Analysis of New Urban Development Using Modern Program Patterns of Urban Planning (Case Study: Khavaran Town of Tabriz) [PDF]

open access: yesجغرافیای اجتماعی شهری, 2017
Urbanization in Iran is increasing ­ from 40s onward, which leads to the creation of ­ Urban plans (comprehensive and detailed) to regulate urban development Due to the fact that they have a purely physical attitude towards cities, such designs are ...
Firouz Jafari, Mahsa Khoshsimay Sardroud
doaj   +1 more source

Self-healing Concrete and Environmental Health [PDF]

open access: yesInternational Journal of Epidemiologic Research, 2018
Nanotechnology will serve as a suitable solution to achieve high performance in future construction. Using this new technology results in creativity and innovation in the construction industry.
Mehrdad Amiri   +2 more
doaj   +1 more source

Features and Conditions of Building Information Modeling Contracts

open access: yesBuildings, 2022
Building information modeling (BIM) has improved efficiency in construction projects by utilizing digital instrument capabilities. However, the use of this technology has brought new challenges, particularly legal and contract issues.
Siamak Nilchian   +3 more
doaj   +1 more source

Reviewing Causes of Delay From the Risk Management Perspective in Execution Stage in Road Construction Projects (Case Study: Garmsar-Simin Dasht Road) [PDF]

open access: yesپژوهش‌های زیرساخت‌های عمرانی, 2020
Delay in construction projects is one of the most common problems. That will increase contract costs, increase construction time overestimated, increase project current costs and time lost due to lack of timely operation.
Reza Mohajeri Borje Ghaleh   +4 more
doaj   +1 more source

Delays in the Road Construction Projects from Risk Management Perspective

open access: yesInfrastructures, 2021
Delays in the execution stage of road construction projects are one of the significant challenges. The incapability of finishing projects according to schedule has attracted many researchers’ attention to this issue.
Reza Mohajeri Borje Ghaleh   +4 more
doaj   +1 more source

Perceptions of automated data collection technology use in the construction industry

open access: yesJournal of Civil Engineering and Management, 2014
Research projects have indicated development of several technical solutions for the management of construction activities. However, little attention has been paid to the issues regarding the adoption and implementation of these techniques.
Javad Majrouhi Sardroud
doaj   +1 more source

A Data Mining Classification Approach for Behavioral Malware Detection

open access: yesJournal of Computer Networks and Communications, 2016
Data mining techniques have numerous applications in malware detection. Classification method is one of the most popular data mining techniques. In this paper we present a data mining classification approach to detect malware behavior.
Monire Norouzi   +2 more
doaj   +1 more source

Extending BIM Interoperability for Real-Time Concrete Formwork Process Monitoring

open access: yesApplied Sciences, 2020
The concrete formwork process is a critical component of construction project control because failing to gain the necessary concrete strength can lead to reworks and, consequently, project delays and cost overruns during the project’s execution ...
Morteza Hamooni   +3 more
doaj   +1 more source

Home - About - Disclaimer - Privacy