Results 361 to 370 of about 3,569,968 (400)
Some of the next articles are maybe not open access.
Energy-Efficient Production Systems Through Schedule-Based Operations
IEEE Transactions on Automation Science and Engineering, 2013Control of production operations is considered as one of the most economical methods to improve energy efficiency in manufacturing systems. This paper investigates energy consumption reduction in production systems through effective scheduling of machine
Guorong Chen+3 more
semanticscholar +1 more source
Journal of Clinical Oncology, 2008
PURPOSE Everolimus is a selective mammalian target of rapamycin (mTOR) inhibitor with promising anticancer activity. In order to identify a rationally based dose and schedule for cancer treatment, we have conducted a tumor pharmacodynamic phase I study ...
J. Tabernero+19 more
semanticscholar +1 more source
PURPOSE Everolimus is a selective mammalian target of rapamycin (mTOR) inhibitor with promising anticancer activity. In order to identify a rationally based dose and schedule for cancer treatment, we have conducted a tumor pharmacodynamic phase I study ...
J. Tabernero+19 more
semanticscholar +1 more source
Journal of the American Academy of Child and Adolescent Psychiatry, 2000
OBJECTIVES To review the historical development, reliability, validity, administrative characteristics, and uses of the Schedule for Affective Disorders and Schizophrenia for School-Age Children (K-SADS).
P. Ambrosini
semanticscholar +1 more source
OBJECTIVES To review the historical development, reliability, validity, administrative characteristics, and uses of the Schedule for Affective Disorders and Schizophrenia for School-Age Children (K-SADS).
P. Ambrosini
semanticscholar +1 more source
Diagnostic Interview Schedule for DSM-IV (DIS-IV)
, 2010The Diagnostic Interview Schedule for DSM-IV (DIS-IV; Robins, Cottler, Bucholz, Compton, North, & Rourke, 2000) is a structured interview designed to diagnose in a reliable and valid fashion the major psychiatric disorders according to the Diagnostic and
D. Segal
semanticscholar +1 more source
The relationship of schedule flexibility and outcomes via the work‐family interface
, 2010Purpose – The purpose of this paper is to examine the relationship of schedule flexibility with performance and satisfaction in the work and family domains, and whether these associations are mediated by the work‐family interface.
Dawn S. Carlson, J. Grzywacz, K. Kacmar
semanticscholar +1 more source
Insertion scheduling: An alternative to list scheduling for modulo schedulers
1996The list scheduling algorithm is a popular scheduling engine used in most, if not all, industrial instruction schedulers. However this technique has several drawbacks, especially in the context of modulo scheduling. One such problem is the need to restart scheduling from scratch whenever scheduling fails at the current value of the initiation interval.
openaire +2 more sources
2006
Publisher Summary This chapter focuses on the variables that need consideration when making the schedule during production. The shooting, or production, schedule shows the order in which scenes are to be shot during production. Organizing and executing a quick and efficient move of the entire production company, a company move, is an art unto itself ...
Peter W. Rea, David K. Irving
openaire +2 more sources
Publisher Summary This chapter focuses on the variables that need consideration when making the schedule during production. The shooting, or production, schedule shows the order in which scenes are to be shot during production. Organizing and executing a quick and efficient move of the entire production company, a company move, is an art unto itself ...
Peter W. Rea, David K. Irving
openaire +2 more sources
2014
Schedules in the polyhedral model, both those that represent the original execution order and those produced by scheduling algorithms, naturally have the form of a tree. Generic schedule representations proposed in the literature encode this tree structure such that it is only implicitly available.
Verdoolaege, Sven+3 more
openaire +4 more sources
Schedules in the polyhedral model, both those that represent the original execution order and those produced by scheduling algorithms, naturally have the form of a tree. Generic schedule representations proposed in the literature encode this tree structure such that it is only implicitly available.
Verdoolaege, Sven+3 more
openaire +4 more sources