Results 251 to 260 of about 29,269 (298)
Some of the next articles are maybe not open access.
2005
Piling is one of the most necessary and powerful construction techniques applied in geotechnical engineering. The efficiency of bored piles (where soil is retrieved) and screwed piles (where soil is displaced) results from the interaction between the performance of the drilling equipment and the modifications created by the drilling process to the soil
Katzenbach R., Schmitt A.
openaire +1 more source
Piling is one of the most necessary and powerful construction techniques applied in geotechnical engineering. The efficiency of bored piles (where soil is retrieved) and screwed piles (where soil is displaced) results from the interaction between the performance of the drilling equipment and the modifications created by the drilling process to the soil
Katzenbach R., Schmitt A.
openaire +1 more source
Installation parameters and capacity of screwed piles
2020This paper proposes a general simplified method for pre-determining the carrying capacity and settlement of displacement pile, installed by screwing. Special emphasis is placed on screw piles of the last generation: Atlas, Omega, De Waal and Spire. The proposed method, has been derived from the interpretation of full-scale loading tests carried out on ...
M. Bustamante, L. Gianeselli
openaire +1 more source
Use of screw piles for floatation resistance
2009Tugun Bypass Tunnel is part of the 7 km long Tugun Bypass connecting Southeast Queensland and Northeast New South Wales in Australia. The tunnel is under an extended section of the Gold Coast Airport runway and is built with diaphragm walls using the cut and cover method.
Hsi J., Zhang H.
openaire +1 more source
Actual directions of scientific researches of the XXI century: theory and practice, 2014
openaire +2 more sources
openaire +2 more sources
Towards a Pile Quality Prediction for Screw Displacement Piles Using Bayesian Networks
2019For screw displacement piles, there is quite some machine data being gathered during the installation, such as torque, pull down and velocity. However, there is no systematic way to process these data and knowledge from the engineer and machinist, neither during nor after the installation stage.
Ana Teixeira +2 more
openaire +1 more source
Numerical analyses of energy screw pile filled with phase change materials
Renewable Energy, 2023Wenbin Fei, Bandeira Neto, L., Sheng Dai
exaly
Calculation method and mechanism of ultimate side resistance of screw pile
Marine Georesources and Geotechnology, 2023Hong-wei, Song Yuan, Qing-rui He
exaly

