Results 301 to 310 of about 737,442 (312)
Some of the next articles are maybe not open access.
Vision-based high-precision intelligent monitoring for shield tail clearance
Automation in Construction, 2022exaly
Application of neural networks to automatic soil pressure balance control for shield tunneling
Automation in Construction, 1997I-Cheng Yeh
exaly
Real-time analysis and regulation of EPB shield steering using Random Forest
Automation in Construction, 2019Pin Zhang, Ren-Peng Chen, Huai-Na Wu
exaly
Preliminary study on shielding performance of wood stuffed shield
International Journal of Impact Engineering, 2016exaly

