Results 111 to 120 of about 5,794 (242)
Tower 5 construction details, Tacoma Narrows Bridge, September 20, 1939
Caption on image: Tacoma Narrows Bridge. Bearing Plate and Grillage on South Pedestal of Tower 5. 9-20-39. Simmer 354. PH Coll.
Simmer
core
SIMMER-II analysis of transition-phase experiments [PDF]
Analyses of Los Alamos transition-phase experiments with the SIMMER-II computer code are reported. These transient boilup experiments simulated the recriticality-induced transient motion of a boiling pool of molten fuel, molten steel and steel vapor ...
Wehner, T. R., Bell, C. R.
core
Caption on image: Placing Caisson Anchor for Pier No. 4, Tacoma Narrows Bridge. 3.-28.-'39. Simmer 24. PH Coll.
Simmer
core
SIMMER as a safety analysis tool [PDF]
SIMMER has been used for numerous applications in fast reactor safety, encompassing both accident and experiment analysis. Recent analyses of transition-phase behavior in potential core disruptive accidents have integrated SIMMER testing with the ...
Bohl, W. R. +5 more
core
Storm cable assembly and catwalks, Tacoma Narrows Bridge, January 10, 1940
Caption on image: Tacoma Narrows Bridge. Looking West on centerline from Stall 75 + 75, showing storm cable Assembly and catwalks. 1-10-40. Simmer 531. PH Coll.
Simmer
core
Caisson for Pier 5, Tacoma Narrows Bridge construction, March 22, 1939
Caption on image: Top View of False bottom of Caisson for Pier 5, Tacoma Narrows Bridge. 3-22-39. Simmer 15. PH Coll.
Simmer
core
Pier 5 caisson, Tacoma Narrows Bridge construction, March 22, 1939
Caption on image: View of underside of false bottom of caisson for Pier 5, Tacoma Narrows Bridge. 3-22-39. Simmer 16 PH Coll.
Simmer
core
Looking west from the spinning tower of the Tacoma Narrows Bridge, January 10, 1940
Caption on image: Tacoma Narrows Bridge. Looking West from Spinning Tower showing Catwalks and Tram Supports. 1-10-'40. Simmer 532. PH Coll.
Simmer
core

