Results 1 to 10 of about 140,577 (292)

Construction Stakeholder Management

open access: yesConstruction Economics and Building, 2010
Construction Stakeholder Management Ezekiel Chiniyo and Paul Olomolaiye (eds), Wiley-Blackwell: Chichester, UK 2010, i-xxiv 1-392 pp, ISBN 978-1-4051-8098-6 (hardback)
Shankar Sankaran
doaj   +4 more sources

Barriers to rural health care from the provider perspective

open access: yesRural and Remote Health, 2023
Introduction: Rural populations routinely rank poorly on common health indicators. While it is understood that rural residents face barriers to health care, the exact nature of these barriers remains unclear.
Avinash Maganty   +6 more
doaj   +1 more source

Development of a Performance Index Model for Evaluation of BIM-Based Stakeholder Management Using Fuzzy Synthetic Evaluation

open access: yesBuildings, 2023
A continuous evaluation of the stakeholder management process can be achieved using definitive key performance indicators (KPIs). An exhaustive literature survey in this direction provided a set of 26 indicators assessed through a questionnaire survey ...
Sulakshya Gaur, Abhay Tawalare
doaj   +1 more source

Stakeholder Management in Public Sector Infrastructure Projects [PDF]

open access: yesJournal of Engineering, Project, and Production Management, 2022
The underlying risks and complexities in government infrastructure projects have increased the importance of external stakeholder management in contemporary project management.
Muhammad Waris   +4 more
doaj   +1 more source

Stakeholder Engagement: The Case of the Russian Largest Oil and Gas Companies [PDF]

open access: yesУправленец, 2018
The study aims to analyse the practice of stakeholder management in seven largest Russian oil and gas companies. The methodological basis includes the stakeholder concept, the concept of corporate social responsibility and the concept of corporate ...
Bataeva B.S.
doaj   +1 more source

Psychological resources in adolescence and the association with labour market participation in early adulthood: a prospective cohort study

open access: yesBMC Public Health, 2020
Background Young adults at the age of 25–29 in Denmark have the highest unemployment rate and are at higher risk of labour market marginalization. Exclusion from the labour market may have negative individual consequences on mental and physical health ...
Jacob Devantie Jensen   +2 more
doaj   +1 more source

Critical success factors for effective internal construction stakeholder management in Nigeria

open access: yesActa Structilia, 2021
In developing countries such as Nigeria, Stakeholder Management (SM) practice is weak. The weakness of this practice often inhibits project goals in terms of time and cost overruns, disputes and lack of trust among the stakeholders.
Wasiu Adeniran Ola-awo   +3 more
doaj   +1 more source

Strategic Management of the Malaga Brand through Open Innovation: Tourists and Residents’ Perception

open access: yesJournal of Open Innovation: Technology, Market and Complexity, 2022
Territory brands are vehicles for transmitting the attributes that identify a geographical setting, they facilitate market positioning and can contribute to generating an opinion that determines the promotion strategies of a place.
Elena Cruz-Ruiz   +3 more
doaj   +3 more sources

Auditing of SARS-COV-2 Contagion and Transmission Protocols as a Stakeholder Management Tool

open access: yesFrontiers in Sustainability, 2021
Governments and companies in all affected countries have taken measures to prevent, on the one hand, the rapid spread of the virus among the population and, on the other hand, to alleviate the economic and commercial consequences of the crisis that is ...
Gianfranco Muncinelli   +7 more
doaj   +1 more source

Influence of trust networks on the cooperation efficiency of PPP projects: moderating effect of opportunistic behavior

open access: yesJournal of Asian Architecture and Building Engineering, 2023
Current studies on trust relationships and their impact on project cooperation efficiency tends to start from a binary perspective of project owners and contractors; however, this viewpoint is problematized with the concept of network-level trust.
Xiang Wang   +3 more
doaj   +1 more source

Home - About - Disclaimer - Privacy