Results 321 to 330 of about 4,639,210 (385)
Some of the next articles are maybe not open access.

Design of Anchored Slabs in Spillway Stilling Basins

Journal of Hydraulic Engineering, 2000
JOURNAL OF HYDRAULIC ENGINEERING A.S.C.E.
FIOROTTO, Virgilio, SALANDIN P.
openaire   +2 more sources

Feasibility Assessment of Basin Solar Stills

International Journal of Green Energy, 2014
The present study assesses the feasibility of exploiting single- and double-basin solar stills in our daily lives. An investigation is carried out to determine the thermal performance and economic viability of making use of solar stills in water desalination.
O. Phillips Agboola   +2 more
openaire   +1 more source

A practical basin-type solar still

Solar Energy, 1965
Abstract A basin-type solar still has been developed that is practical and economical to use in some parts of the world. Materials of construction and performance characteristics, as determined from extensive field testing and from analytical and laboratory investigations, are discussed.
J.W. Bloemer   +3 more
openaire   +1 more source

Free-surface mapping of air-water flows in a stilling basin

, 2020
Energy dissipation is an important aspect in the design of hydraulic structures. Stilling basins are a common type of energy dissipator in which a hydraulic jump dissipates large amounts of the flow energy.
Rui Li, Kristen D. Splinter, S. Felder
semanticscholar   +1 more source

Expanding stilling basin

1990
These Ecole polytechnique federale de Lausanne EPFL, n° 850 (1990)Laboratoire de constructions hydrauliques Reference doi:10.5075/epfl-thesis-850Print copy in library catalog Record created on 2005-03-16, modified on 2016-08 ...
openaire   +1 more source

Hydraulic Design of Stilling Basins: Short Stilling Basins for Canal Structures, Small Outlet Works, and Small Spillways (Basin III)

Journal of the Hydraulics Division, 1957
Continuing the development in Paper 1402, this paper describes tests to generalize the design of a shorter stilling basin containing chute blocks, end sill, and one row of baffle piers. General design rules and sample problems are included. Critical basin dimensions, water surface profiles, and tail water ranges are presented in dimensionless forms.
J. N. Bradley, A. J. Peterka
openaire   +1 more source

Types of Stilling Basins

1992
Except for larger structures or unusual circumstances, a stilling basin may not be tested in a hydraulic lab, or it may be tested with respect to several features although the final design does not involve a series of model studies. Based on this fact, several standardised basins were developed in the past, among which mention might be made of the
openaire   +1 more source

Experiences with Stilling Basins

1992
As compared to the number of laboratory studies, where stilling basins were tested and their performance improved by various appurtenances, the information on the actual behaviour of prototypes is scarce. A number of general comments on “stilling basin experiences” are outlined, as was done in a classical paper by Berryhill.
openaire   +1 more source

Campos Basin: Challenges Still to Overcome

Offshore Technology Conference, 2003
Abstract Petrobras stepped into the third millennium with an ambitious plan for offshore oil production. As a natural sequence of the most recent breakthroughs achieved in deep and ultradeepwater activities, Petrobras now prepares itself to operate in an even more difficult scenario in Campos Basin: deeper water, up
Kazuioshi Minami   +4 more
openaire   +1 more source

Riprap Design for SAF Stilling Basins

Transactions of the ASAE, 1992
Physical model tests were conducted to determine criteria for the size and placement of riprap downstream of SAF stilling basins to ensure basin integrity. Relationships are presented to determine the depth, width, and length for preformed scour holes as a function of the Froude number and riprap size.
null C. E. Rice, null K. C. Kadavy
openaire   +1 more source

Home - About - Disclaimer - Privacy