Results 111 to 120 of about 5,546 (148)
Some of the next articles are maybe not open access.
A Preview of the Subsea Christmas Tree Installation Procedure
Chemistry and Technology of Fuels and OilsXinjing Xu +4 more
openaire +2 more sources
Correction to: A Preview of the Subsea Christmas Tree Installation Procedure
Chemistry and Technology of Fuels and OilsXinjing Xu, Jinfeng Ji, Li Li, Xiang Xu
openaire +2 more sources
Proceedings of the 31st European Safety and Reliability Conference (ESREL 2021), 2021
Fernanda Marques de Moura +2 more
openaire +2 more sources
Fernanda Marques de Moura +2 more
openaire +2 more sources
Third International Conference on Advanced Materials and Equipment Manufacturing (AMEM 2024)
As offshore oil and gas development progresses toward high-pressure, high-temperature, and increasingly complex working conditions, the improvement of standard systems for subsea Christmas trees and wellhead equipment becomes critical to ensuring ...
Xing Jin, Yingjie Su, Hao Fan, Yongli Hu
openaire +2 more sources
As offshore oil and gas development progresses toward high-pressure, high-temperature, and increasingly complex working conditions, the improvement of standard systems for subsea Christmas trees and wellhead equipment becomes critical to ensuring ...
Xing Jin, Yingjie Su, Hao Fan, Yongli Hu
openaire +2 more sources
A New Technique to Solve Gas Hydrate Problems in Subsea Christmas Trees
SPE Production & Facilities, 2004Summary The paper is aimed at describing the series of actions taken to re-enter a well, the (wet) Christmas-tree cap of which was clogged by solid hydrate and therefore could not be released by means of a regular releasing tool.
L. C. C. Marques +2 more
openaire +2 more sources
THROUGH BORE SUBSEA CHRISTMAS TREES
Proceedings of Offshore Europe, 1985Abstract The workovers of subsea completed wells are expensive and time consuming as even the most routine tasks must be carried out by a semi-submersible. This paper describes the economic, safety and operational advantages which led to the development and successful first installation of ‘through bore’ subsea production trees.
D S Huber, G F C Simmers, C S Johnson
openaire +1 more source

