Results 61 to 70 of about 16,854,779 (157)

Conductive Bonding and System Architectures for High‐Performance Flexible Electronics

open access: yesAdvanced Functional Materials, Volume 36, Issue 33, 23 April 2026.
This review outlines bonding technologies and structural design strategies that support high‐performance flexible and stretchable electronics. Bonding approaches such as surface‐activated bonding and anisotropic conductive films, together with system‐level architectures including buffer layers and island‐bridge structures, possess distinct mechanical ...
Kazuma Nakajima, Kenjiro Fukuda
wiley   +1 more source

Spatiotemporal Planning of Construction Projects: A Literature Review and Assessment of the State of the Art

open access: yesFrontiers in Built Environment, 2020
Recently, new methods and technologies, including building information modeling (BIM) and lean management, have been introduced to the construction industry.
Fabian Ardila, Adel Francis
doaj   +1 more source

Colloidal Wet Coating Techniques of Two‐Dimensional Materials

open access: yesAdvanced Materials Technologies, Volume 11, Issue 6, 18 March 2026.
This review highlights colloidal wet‐coating strategies for assembling uniform and functional films of 2D materials. It categorizes layer‐by‐layer, Langmuir–Blodgett, spin, spray, and rapid‐drying techniques based on their driving mechanisms, interfacial interactions, and processing parameters.
Kyeonghun Jeong, Dongwook Lee
wiley   +1 more source

Reducing the takt time of bezel group [PDF]

open access: yes, 2020
Zaradi večjega naročila kupca bo treba dvigniti produktivnost linije ali kupiti dodatno montažno linijo, kar bi bil prevelik finančni zalogaj. Dviga produktivnosti in krajšanja časa takta se lahko lotimo na različne načine.
Dimec, Ažbe
core  

Developing support for BIM-based takt time schedules for production control [PDF]

open access: yes, 2022
Cost and schedule overruns are a major issue in the construction industry and a variety of location and activity-based planning, and control methods are used to address these issues.
Viklund Tallgren, Mikael   +3 more
core  

A Dynamic Optimization Method of Material Distribution Intervals and Quantity for High-End Equipment Manufacturing

open access: yesIEEE Access
To address the logistics problems faced by high-end equipment manufacturers in their two-stage supply chain, this study proposes an optimization strategy for material distribution intervals and quantities.
Zhiwen Zhang   +3 more
doaj   +1 more source

Modification Strategies of Carbon‐Based Electrodes From Structural Regulation to Multifunctional Integration

open access: yesAdvanced Science, Volume 13, Issue 14, 9 March 2026.
Tracing the evolution from structural regulation to multifunctional integration, this paper systematically analyzes modification strategies for carbon‐based electrodes. It evaluates how element doping, surface functionalization, and composite material design affect the electrode performance, and offers perspectives on future applications and challenges
Yunlei Wang   +4 more
wiley   +1 more source

Takt time in production

open access: yes, 2007
Bu makalede "yalın üretim"in temel kavramlarından biri olan takt zamanın ne olduğu ve nasıl kullanıldığı hakkında genel bilgi verilmiştir. Takt zaman kavramının konfeksiyon sektöründeki kullanımı örnekle açıklanmış ve işletmelere getirdiği avantajlara ...
Güner, Mücella, Ünal, Can
core  

A Framework for the Implementation of Takt Time in High-Variety, Low-Volume Manufacturing Environments [PDF]

open access: yes, 2019
Verdikjeder med høg produktvariasjon og lave produksjonsvolum (HVLV) blir stadig viktigare då HVLV-produsentar lagar spesialtilpassa produkt i mange variantar som i aukande grad blir etterspurde i marknaden.
Øystese, Hallvard
core  

Short Takt in Construction: A Systematic Literature Review [PDF]

open access: yes
Over the past decade, Takt planning has steadily gained ground as a production system design scheme in construction projects. The approach entails organising trades as wagons in a train and running that train through a set of designated work areas in a ...
Munkvold, Malin Furuli   +1 more
core   +1 more source

Home - About - Disclaimer - Privacy