Results 121 to 130 of about 210 (144)
Some of the next articles are maybe not open access.

Workload Leveling Based on Work Space Zoning for Takt Planning

Automation in Construction, 2020
Abstract This paper focuses on a location-based method used in construction, namely the Work Density Method (WDM) for takt planning. The contribution to knowledge is presenting a problem formulation and a mathematical optimization algorithm to divide a work space into zones while leveling work densities across trades in a process.
Philip Kaminsky   +2 more
exaly   +2 more sources

Work Density Method for Takt Planning of Construction Processes With Nonrepetitive Work

Journal of Construction Engineering and Management - ASCE, 2022
Iris D. Tommelein
exaly   +2 more sources

Development of a Takt-time Plan: A Case Study

Construction Research Congress 2014, 2014
Takt time is a design parameter used in production settings, be it manufacturing or construction, tuning the rate of work output to the customer’s rate of demand. Recent industry experiments have shown that takt-time planning and execution of construction work can yield significant benefits in regards to time savings, money savings, improved quality ...
Adam Frandson, Iris D. Tommelein
openaire   +1 more source

A Logistic Framework to Enable Takt Time Planning

Annual Conference of the International Group for Lean Construction, 2023
Raquel H. Reck, Marcus C. T. Fireman
openaire   +1 more source

Do Failures in a Takt Plan Fit the FMEA Framework?

Annual Conference of the International Group for Lean Construction, 2023
Becca Apgar, James P. Smith
openaire   +1 more source

Takt Planning Effectiveness Into One Billion Dollars Projects

Annual Conference of the International Group for Lean Construction, 2022
Mohamed Abou El Fish   +5 more
openaire   +1 more source

Production, Takt and Lead Time Variation: Production Planning and Tardiness Probabilities in Small-Lot Production

2014 International Conference on Collaboration Technologies and Systems (CTS), 2014
This paper describes the production planning and control processes of two companies, which interact closely in the maritime supply chain. Our claim is that current theoretical models of the near-static tardiness that may be observed are insufficient. We offer an alternative, probability-based approach.
exaly   +3 more sources

Implementing Takt Planning in Structural Design

2018
This Master’s Thesis covers how takt planning has been used in manufacturing and construction production, and how it could be applied to structural design. The objective of the study is to develop a proposal for a concept where takt planning is implemented in the target company’s structural design processes and other lines of business, with the help of
openaire   +1 more source

How Takt Production Contributes to Construction Production Flow: A Theoretical Model

Construction Management and Economics, 2021
Max Grönvall   +2 more
exaly  

Home - About - Disclaimer - Privacy