Results 91 to 100 of about 16,897,965 (190)
Investigating the Effects of Assembly Order on the Performance in Relation to Cognitive and Physical Demands Under Takt Time [PDF]
Assembly line operations generally involve physical and cognitive demanding tasks. Simultaneous performance under physical and cognitive demanding tasks may create physical and mental stresses.
Shakeel Ahmed Shaikh +2 more
doaj
Takt Time, Cycle Time, One- Piece Flow and Hejunka
Takt time, Cycle time, One-piece flow, Hejunka This Report is a Part of the Published Book "Takt Time: A Guide to the Very Basic Lean Calculation" All rights reserved
openaire +1 more source
Karakuri Kaizen Design to Reduce Work Time at the Packing Station
This study investigates production bottlenecks at the packing station of PT Anta Boga Pangan Nusantara, where manual operations resulted in prolonged cycle times and reduced efficiency.
Yusuf Mauluddin, Bagas Fardiansyah
doaj +1 more source
A Staged Lean–Industry 4.0 Framework for Progressive Automation of Industrial Internal Transport
Industrial internal transport is a persistent source of non-value-added time in manufacturing, yet is rarely addressed as a dedicated scope in Lean–Industry 4.0 integration frameworks.
Paula Lamo +3 more
doaj +1 more source
Reports on the use of takt tend to focus on applications aimed at so-called operational takt planning. Instead, this paper focuses on strategic takt planning. Strategic- and operational takt planning must go hand in hand.
Emdanat, S, Tommelein, ID
core +1 more source
Industri manufaktur sepatu olahraga menghadapi tantangan dalam meningkatkan efisiensi produksi, terutama dalam mengurangi lead time dan pemborosan.
Esa Pratiwi +2 more
doaj +1 more source
Short Takt Time in Construction – a Practical Study [PDF]
Binninger, M. +4 more
openaire +2 more sources
Conventional single-modality or loosely coupled inspection systems often degrade under partial occlusion, transient sensor dropout, or illumination drift, and their feedback to Manufacturing Execution Systems (MES) can be delayed or non-deterministic. We
Yong Lin, Wendi Lin, Yadi Lin
doaj +1 more source
Performance Comparison of Coreless PCB AFPM Topologies for Duct Fan
Duct fan motors must provide high torque within limited space to maintain airflow while requiring low vibration characteristics to minimize fluid resistance caused by fan oscillation.
Seung-Hoon Ko +4 more
doaj +1 more source
Aplicación del Time Management para la mejora del Takt Time en la Empresa Muestreo y Análisis SAC, Bellavista, 2015 [PDF]
La presente investigación titulada: “Aplicación del Time Management para la mejora del Takt Time en la empresa Muestreo y Análisis SAC, Bellavista, 2015”, tuvo como objetivo determinar cómo el Time Management mejora el Takt Time de la Empresa Muestreo
Huamani Palomino, Luz María
core

