“Dynamic Lean Assessment for Takt Time Implementation” [PDF]
AbstractIncreasing volatility, global competitiveness, and sales crisis all force the manufacturers to commit to the journey of world-class manufacturing performance via adopting “lean systems” to enable economic success in difficult times. Among the journey to lean, one of the hardest steps is measuring the progress of lean polices implementation ...
Ali, Rehab M., Deif, Ahmed M.
exaly +5 more sources
Analysis Time Study and Takt Time in the Product Loading Process
A warehouse is a place to store goods in a neat and orderly manner, so that the capacity of the room can be used optimally. The process of moving in a good way can reduce material handling costs. There is a difference in roll loading process time between morning, afternoon and night shifts.
Mochammad Amru Nail Suherman +1 more
exaly +6 more sources
Concepts for digitalisation of assembly instructions for short takt times
Operational complexity for shop-floor operators can be reduced with e ective presentation of instructions, which in turn improves product quality. While this has been researched for longer takt times, final assembly with shorter takt times requires new approaches to properly support operators.
Anna Palmqvist +4 more
openaire +3 more sources
Achieving a 4-Hour Takt Time – and Driving Change With It
Peer ...
Rannisto, Jukka +5 more
openaire +4 more sources
Use of Overall Equipment Effectiveness (OEE) in manufacturing cells considering takt time [PDF]
Among ways of measuring and improving the efficiency of industrial processes, we highlight the use of Overall Equipment Effectiveness (OEE) also known as the Global Efficiency Index. This efficiency indicator is characterized by taking into account these
Leonardo de Carvalho Gomes +1 more
doaj +2 more sources
Takt time planning for construction of exterior cladding [PDF]
This paper presents the concept and steps taken, as well as a case study on production scheduling, to implement the use of Takt time. It starts with an overview of traditional construction scheduling and contrasts that with the use of production scheduling using Takt time.
Frandson, A, Berghede, K, Tommelein, ID
openaire +2 more sources
Designing modern disassembly systems requires the integration of industrial automation equipment. Due to the support of various communication protocols, PLCs not only perform control tasks but also act as intelligent data centers in distributed ...
Adrian Kampa +4 more
doaj +3 more sources
Takt Time, el corazón de la producción
Sin ...
Miguel Ángel Martínez Zapata +1 more
openaire +4 more sources
About Time-Cost Trade-Offs in Takt Planning [PDF]
Time-cost trade-off problems in construction scheduling are well known and described in the literature, but time-cost trade-off problems pertaining specifically to takt planning have received little attention to date. Previous papers have introduced concepts and applications of takt planning (aka. takt production) in construction.
Tommelein, Iris D
openaire +3 more sources
A Comparison of takt time and LBMS planning methods [PDF]
Takt time and LBMS are getting increased attention from practitioners of Lean Construction. The takt time approach focusses on designing work locations with similar quantities and plans on the same duration for each task without any buffers. To achieve level resource utilization takt time projects require substantial work backlog tasks or locations to ...
Seppänen, Olli