Results 291 to 300 of about 7,052,262 (327)
Some of the next articles are maybe not open access.

Tourism Technical Analysis System

Tourism Economics, 2006
Accurate forecasts of tourism demand are prerequisites in the decision making process in many organizations in the private and public sectors. Any information concerning the future evolution of tourism flows is of great importance to hoteliers, tour operators and other industries concerned with tourism, services or transportation.
Petropoulos, C.   +4 more
openaire   +2 more sources

On Technical Analysis

Review of Financial Studies, 1989
Technical analysis, or the use ofpastprices to infer private information, has value in a model in which prices are not fully revealing and traders have rational conjectures about the relation between prices and signals. A two-period dynamic model of equilibrium is used to demonstrate that rational investors use historical prices in forming their ...
David P. Brown, Robert H. Jennings
openaire   +1 more source

Technical Analysis

2021
Shveta Singh, Surendra S. Yadav
openaire   +2 more sources

Technical Analysis Toolkit

2013
We present in this chapter some basic features and functionalities of a toolkit for technical analysis of stocks (T-TAS) developed under a MATLAB environment (Version 6.5 and above). The initial version of the toolkit [34] was a result of a final year project conducted in the Department of Electrical and Computer Engineering, National University of ...
Xiaolian Zheng, Ben M. Chen
openaire   +1 more source

Technical Analysis

2018
A comprehensive feasibility study should continue with a technical analysis if the market analysis, as explained in the chapter, defines a sufficiently large market share for the product to be manufactured through a foreign direct investment project. The technical analysis as the second stage of a feasibility study aims at determining whether or not ...
openaire   +1 more source

Technical Analysis

2012
Fatima Shah, Federica Ranghieri
  +4 more sources

Technical Economical Analysis

2015
CCSD-1 Well was officially started on June 25th, 2001, and the designed coring drilling tasks was completed on January 23rd, 2005, when drilled to 5118.2 m. From January 25th, 2005 to March 8th, drilling tools were tested and the well was drilled to 5158 m, and the whole well drilling constructions were completed.
Da Wang   +15 more
openaire   +1 more source

Home - About - Disclaimer - Privacy