Risk Interdependency Network Model for the Cost and Time of Pile Installation in Saudi Arabia, Using Partial Least Squares Structural Equation Modeling [PDF]
Pile construction projects cause significant time and expense overruns. The pile installation activity is the primary reason for project underperformance and uncertainties.
Naif M. Alsanabani +3 more
doaj +3 more sources
Construction of the Optimization Model of Cargo Transport Network [PDF]
The transportation is gradually integrated into the circulation system of bulk goods, and developing and growing. Transportation has the advantages of high efficiency, high quality and green environment, In time, efficiency and cost than the traditional ...
Kong Yanyan +6 more
doaj +1 more source
High-performance computing changes the way of computing. With emerging technologies like grid computing, cloud computing and smart health care application has changed the way we compute and communicate.
Pradeep Rawat +4 more
doaj +1 more source
A method for finding a least-cost corridor on an ordinal-scaled raster cost surface
The least-cost path problem is a widely studied problems in geographic information science. In raster space, the problem is to find a path that accumulates the least amount of cost between two locations based on the assumptions that the path is a one ...
Lindsi Seegmiller, Takeshi Shirabe
doaj +1 more source
The study aimed to reveal the role of employing the PERT method in planning academic leadership training programs in Saudi universities. The PERT method was also applied in the aspect of time and cost on EXCEL software, one of PERT's computer ...
Amani Awaji
doaj +1 more source
FeedMaster: A least-cost feed formulation App for minimizing the cost and maximizing milk yield
Objective: The study aimed to develop and assess an Android app designed for farmers with a low educational status that can formulate a least-cost ration.
Md. Ahsanul Kabir +5 more
doaj +1 more source
Developing a Project Planning Model Considering the Executive Methods and the Rework Activity [PDF]
In this research, a model with three objective functions is presented to solve the problem of time, cost and quality trade-off in project planning. What distinguishes this model is that, in addition to considering different executive methods for each ...
Javad Ahmadi Moghadam +2 more
doaj +1 more source
Variable population exposure and distributed travel speeds in least-cost tsunami evacuation modelling [PDF]
Evacuation of the population from a tsunami hazard zone is vital to reduce life-loss due to inundation. Geospatial least-cost distance modelling provides one approach to assessing tsunami evacuation potential.
S. A. Fraser +5 more
doaj +1 more source
Estimating the cost of training disruptions on marathon performance
Completing a marathon usually requires at least 12–16 weeks of consistent training, but busy lifestyles, illness or injury, and motivational issues can all conspire to disrupt training. This study aims to investigate the frequency and performance cost of
Ciara Feely +4 more
doaj +1 more source
Improving Time-Cost Balance in Critical Path Method (CPM) Using Dragonfly Algorithm (DA) [PDF]
The CPM (critical path method) technique is to search out the longest path to try and do activities, so as to compress and cut back the time it takes for a project, which finally ends up inside the creation of an identical and intensive network of ...
Mohmmad Anvar Adibhesami +3 more
doaj +2 more sources