Results 191 to 200 of about 11,793 (228)
Some of the next articles are maybe not open access.
Methods for Coupled Analysis of TLP's
Offshore Technology Conference, 1991ABSTRACT This paper investigates means by which the customary methods used to model TLP's in the frequency domain may be improved through more detailed consideration of tendon dynamics. The objective is to improve upon the method of modeling tendons as simple equivalent springs, and thus to improve the accuracy of ...
K.B. Davies, J.C.H. Mungall
openaire +1 more source
Offshore Technology Conference, 1999
Abstract The original Ursa TLP development plan called for 16 production wells, 11 firm and 5 contingent. Initial design was for 11 TLP wells and 3 subsea wells. The plan also included batch setting 21 well positions and pre-drilling 6 of the TLP wells in 3,950' of water in MC block 810.
J.R. Carminati +3 more
openaire +1 more source
Abstract The original Ursa TLP development plan called for 16 production wells, 11 firm and 5 contingent. Initial design was for 11 TLP wells and 3 subsea wells. The plan also included batch setting 21 well positions and pre-drilling 6 of the TLP wells in 3,950' of water in MC block 810.
J.R. Carminati +3 more
openaire +1 more source
The Hutton TLP Foundation Design
Offshore Technology Conference, 1984ABSTRACT The Hutton Tension Leg Platform poses several new problems for the design of the foundations. This paper describes the design considerations and the process of design, with emphasis on special aspects prescribed by the Hutton TLP concept. The method of analysis of the template structure is
H. Bradshaw, R.R. Barton, R.H. McKenzie
openaire +1 more source
INCREMENTAL PARSING WITH LD/TLP‐TAGS
Computational Intelligence, 1994A main purpose of natural language systems (NL‐systems) is the simulation of human speech behavior, which divides into generation and analysis, in all kinds of situations. Humans process natural language in an incremental style, which means that sentences are generated or analyzed in a piecemeal fashion.
openaire +1 more source
Construction and Installation of the Prince TLP
Offshore Technology Conference, 2002Abstract This paper will discuss the construction and installation of the new generation MOSES TLP for the Prince field located in 1,472 feet of water in the Gulf of Mexico. Discussion regarding the field development and development of the MODEC MOSES TLP can be found in OTC paper #14173.
William S. Rawles, David E. Chaplin
openaire +1 more source
Riser Tensioners for a TLP Application
Offshore Technology Conference, 1985ABSTRACT This paper summarizes the design of the production, pipeline, and drilling riser tensioners for a TLP application. The riser tensioners are similar in concept and were designed to be comp act, se1f -contained units.
F.H. MacPhaiden, J.P. Abbot
openaire +1 more source
New Directions in TLP Technology
Offshore Technology Conference, 2002Abstract Of the many deepwater platform concepts that were developed as deepwater platform technology matured, the TLP has been the most frequently selected for deepwater construction projects. Over the past two decades, TLP technology has proven to be a safe and reliable means for establishing deepwater real estate
Stephen E. Kibbee, David C. Snell
openaire +1 more source
MARS TLP - lntegration and Installation
Offshore Technology Conference, 1997Abstract This paper focuses on the experience gained during the development and use of the novel aspects of the integration and installation of the MARS TLP project. These include:- The use of a Specialized Lifting Device [SLD] to place the MARS TLP topsides on the hull at lngleside, Texas.
Richard Garside +5 more
openaire +1 more source
2013
1970 to 1971. Patrick tries to drum up more enthusiasm in Transient Lunar Phenomena (TLP) and commentates on the Apollo 14 and 15 missions. Also includes his friendship with Horace Dall and Dall’s 70th birthday party.
openaire +1 more source
1970 to 1971. Patrick tries to drum up more enthusiasm in Transient Lunar Phenomena (TLP) and commentates on the Apollo 14 and 15 missions. Also includes his friendship with Horace Dall and Dall’s 70th birthday party.
openaire +1 more source
A new quasi-dynamic method for the prediction of tendon tension of TLP platform
Ocean Engineering, 2023Wei Huang, Binbin Li, Xiao-Bo Chen
exaly

