Heuristic procedures for reactive project scheduling. [PDF]
This paper describes new heuristic reactive project scheduling procedures that may be used to repair resource-constrained roject baseline schedules that suer from multiple activity duration disruptions during project execution.The objective is to ...
Van de Vonder, S +3 more
core
َA Multi-objective simulated annealing algorithm to solving flexible no-wait flowshop scheduling problems with transportation times [PDF]
This paper deals with a bi-objective hybrid no-wait flowshop scheduling problem minimizing the makespan and total weighted tardiness, in which we consider transportation times between stages.
Bahman Naderi, Hassan Sadeghi
doaj
Order acceptance and scheduling in a single-machine environment: exact and heuristic algorithms. [PDF]
In this paper, we develop exact and heuristic algorithms for the order acceptance and scheduling problem in a single-machine environment. We consider the case where a pool consisting of firm planned orders as well as potential orders is available from ...
Herbots, Jada +2 more
core
An iterated dynasearch algorithm for the single-machine total weighted tardiness scheduling problem
This paper introduces a new neighborhood search technique, called dynasearch, that uses dynamic programming to search an exponential size neighborhood in polynomial time.
Congram, Richard K. +2 more
core +1 more source
A new dominance rule to minimize total weighted tardiness with unequal release dates
We present a new dominance rule by considering the time-dependent orderings between each pair of jobs for the single machine total weighted tardiness problem with release dates.
Özdemir, D. +3 more
core +1 more source
Fuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flow Time through Genetic Algorithm [PDF]
Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters; this is why in recent decades extensive studies have been done on scheduling issues.
Mohammad Asghari, Samaneh Nezhadali
doaj
A Survey of Metaheuristic Approaches to Single Machine Total Weighted Tardiness Problem
A survey of metaheuristic approaches to single machine total weighted tardiness problemTelif hakları gereğince yayın erişime kapalıdır.
Adak, Zeynep
core
New Precedence Theorems for One-Machine Weighted Tardiness
In an earlier paper by Emmons [Emmons, H. 1969. One-machine sequencing to minimize certain functions of job tardiness. Oper. Res. 17 701–715], the problem of sequencing jobs on a single machine in order to minimize total tardiness was analyzed.
Kanet, John J.
core +1 more source
The element-wise weighted total least squares problem
A new technique for parameter estimation is considered in a linear measurement error model AX approx B, A = A0 + tilde A, B = B0 + tilde B, with row-wise independent and non-identically distributed measurement errors tilde A, tilde B.
Premoli, P. +3 more
core +1 more source
Energy-Efficient Single Machine Total Weighted Tardiness Problem with Sequence-Dependent Setup Times
Most of the problems defined in the scheduling literature do not yet take into account the energy consumption of manufacturing processes, as in most of the variants with tardiness objectives.
Deniz Türsel Eliiyi +14 more
core +1 more source