Results 41 to 50 of about 6,981,143 (177)
Covalent Organic Frameworks in Smart Food Packaging: Advances, Challenges, and Future Prospects
ABSTRACT Food preservation challenges have positioned packaging as a rapidly evolving, innovation‐driven field, with smart packaging offering transformative solutions. Among advanced materials, covalent organic frameworks (COFs) have attracted growing attention due to their permanent porosity, structural tunability, high surface area, and chemical ...
Sara Esteghlal +3 more
wiley +1 more source
Total weighted tardiness in the permutation flow shop under uncertainty
This paper addresses the total weighted tardiness permutation flow shop with uncertain processing time and a distinct due date. It proposes an uncertain chance-constrained programming model.
Echchatbi, A., +3 more
core +1 more source
Sustainable manufacturing requires schedules that balance environmental responsibility with delivery reliability. This paper studies the Carbon-Aware Flexible Job Shop Scheduling Problem with Tardiness Penalty (CAFJSP-T), where total carbon emissions and
Saurabh Sanjay Singh, Deepak Gupta
doaj +1 more source
Scheduling optimization of optical lens polishing
Abstract Optical systems have achieved notable progress in focusing and imaging technologies; however, manual grinding remains indispensable, resulting in elevated costs, extended timelines, and inefficiencies. These difficulties are compounded by operational constraints, uneven machine utilization, and risks of order delays and escalating expenses ...
Tzu‐Chin Lin, Bertrand M. T. Lin
wiley +1 more source
Minimizing total weighted tardiness for the single machine scheduling problem with dependent setup time and precedence constraints [PDF]
This paper tackles the single machine scheduling problem with dependent setup time and precedence constraints. The primary objective of this paper is minimization of total weighted tardiness. Since the complexity of the resulted problem is NP-hard we use
Hamidreza Haddad +1 more
doaj
An ant colony optimization for an Integrated Production and Distribution Scheduling Model in Supply Chains: Minimizing Total Weighted Tardiness and Delivery Cost [PDF]
In this paper, integrated production and batch delivery scheduling problem for make to order production system and one customer in supply chain has been addressed. One manufacture received n orders from one customer.
Seyed Reza Rezaei +2 more
doaj +1 more source
The impact of public drop‐off boxes and autonomous delivery robots in last‐mile delivery
Abstract The growing concern over emissions from last‐mile logistics is motivating the development of innovative delivery models aimed at reducing environmental impact and traffic congestion. To this end, we propose a last‐mile delivery scheme based on both public drop‐off boxes and autonomous delivery robots.
Gianpaolo Ghiani +3 more
wiley +1 more source
A new heuristic for the total tardiness problem with parallel machines [PDF]
Biskup D, Herrmann J. A new heuristic for the total tardiness problem with parallel machines. Discussion paper / Fakultät für Wirtschaftswissenschaften, Universität Bielefeld.
Biskup, Dirk, Herrmann, Jan
core
Abstract Lightning‐ignited wildfires (LIWs) are a major contributor to burned area in Northern California and have increased substantially in size over recent decades. Predicting LIWs remains challenging because ignition depends on both lightning occurrence and fuel‐meteorology interactions.
Sally S.‐C. Wang +3 more
wiley +1 more source
This study provides the first comparative phytochemical and functional evaluation of Gonocytisus angulatus and Podocytisus caramanicus seeds. Methanolic extracts showed richer phenolic profiles, while aqueous decoctions provided higher extraction yields. P. caramanicus exhibited strong ABTS radical scavenging activity.
Burak Bayrak +12 more
wiley +1 more source

