Results 181 to 190 of about 2,585,798 (346)
Optimal Trajectory Planning and Train Scheduling for Railway Systems
Safe, fast, punctual, energy-efficient, and comfortable rail traffic systems are important for rail operators, passengers, and the environment. Due to the increasing energy prices and environmental concerns, the reduction of energy consumption has become
Wang, Y., Wang, Y. (author)
core
ABSTRACT Background Emerging evidence suggests that low‐frequency neural oscillations are dynamically regulated by consciousness levels, with the recovery of low cortical activity potentially serving as a neurophysiological substrate for conscious emergence. Targeted enhancement of these low‐frequency rhythms in patients with disorders of consciousness
Chuan Xu +10 more
wiley +1 more source
A linear programming joint optimization model of overnight train timetabling and maintenance planning on high-speed railway. [PDF]
Zhang T, Liang W, Ji H, Zhang C.
europepmc +1 more source
Epilepsy‐Associated Variants of a Single SCN1A Codon Exhibit Divergent Functional Properties
ABSTRACT Objective Pathogenic variants in SCN1A, which encodes the voltage‐gated sodium channel NaV1.1, are associated with multiple epilepsy syndromes exhibiting a range of clinical severity. SCN1A variants are reported in different syndromes, including Dravet syndrome, which is associated with loss‐of‐function, whereas neonatal/infantile‐onset ...
Lanie N. Liebovitz +3 more
wiley +1 more source
Shared drone route scheduling optimization. [PDF]
Hong C, Yan Y, Lian Z, Li X.
europepmc +1 more source
Optimising the Scheduling of Train Unit Cleaning
Scheduling of Train Unit Cleaning is one of the planning processes required at DSB, The Danish Railway Company. In order to ensure an adequate service level to its customers, train cleaning must be planned as efficiently as possible.
Fanin, Giovanni
core
Trip scheduling on single track networks -- the TUFF train scheduler
A novel constraint model for scheduling train trips on a network of tracks used in both directions is described. We argue that a generalization of a job-shop scheduling formulation can drastically decrease the problem size.
Per Kreuger, et al.
core
Location‐Specific Hematoma Volume Predicts Early Neurological Deterioration in Supratentorial ICH
ABSTRACT Objective Early neurological deterioration (END) adversely affects outcomes in patients with intracerebral hemorrhage (ICH). This study aimed to determine the location‐specific hematoma volumes for END in supratentorial ICH patients. Methods We retrospectively analyzed supratentorial ICH patients presenting from two prospective cohorts.
Zuoqiao Li +10 more
wiley +1 more source
Tensor language model enables generative scheduling for efficient tensor compilation. [PDF]
Mehmood S +7 more
europepmc +1 more source

