Results 231 to 240 of about 59,556 (258)
Some of the next articles are maybe not open access.
Umbilical-Less Tubing Hanger Installation Controls System
Offshore Technology Conference, 2021Abstract The umbilical-less tubing hanger running installation tool, ROCS ("Remote Operated Control System") was first introduced as an R&D project to the market in early 2020. By February 2021, it is in operation for Aker BP in the North Sea on Deepsea Nordkapp. ROCS is specifically designed to increase the robustness
Thor Lovland, Trond Lokka
openaire +2 more sources
Implications of failure of alloy 718 (UNS N07718) tubing hanger in sour well
Engineering Failure Analysis, 2021Abstract High pressure/high-temperature (HP/HT) Oil & Gas wells in sour service are currently installed with UNS N07718 tubing hangers. Failure of UNS N07718 tubing hanger was recently discovered in one of the sour wells after more than ten years in service.
Janardhan Rao Saithala +4 more
openaire +2 more sources
Strength design method for tubing hanger of subsea christmas tree against big temperature difference
China Ocean Engineering, 2014The tubing hanger is an important component of the subsea Christmas tree, experiencing big temperature difference which will lead to very high thermal stresses. On the basis of API 17D/ISO 13628-4 and ASME VIII-1, and by comprehensively considering the erosion of oil and the gravity load of the tubing, a calculation model is established by regarding ...
Xiao-lan Luo +5 more
semanticscholar +3 more sources
Wireless Tubing Hanger Deployment in Deepwater Environment, the Bonga Field Experience
Offshore Technology ConferenceAbstract The deployment of Tubing Hangers (TH) in offshore subsea wells is a critical aspect of oil and gas production systems. The Tubing Hanger is a key component in well completion, allowing for the suspension of tubing, communication of hydraulic and electric functions downhole, and sealing the annulus. The installation and retrieval
J. Ngerebara, O. Alawode, I. Hamzat
openaire +2 more sources
High-Power ESP Tubing-Hanger Connector for Deepwater Downhole Applications
Journal of Petroleum Technology, 2014This article, written by Special Publications Editor Adam Wilson, contains highlights of paper OTC 24138, ’Reliable High-Power ESP Tubing-Hanger Connector Systems for Deepwater Downhole Applications,’ by Sami Spahi, Teledyne Oil and Gas, and Pamela Parsley, Chevron Energy Technology Company, prepared for the 2013 Offshore Technology Conference, Houston,
Adam Wilson
openaire +2 more sources
Offshore Nickel Alloy Tubing Hanger and Duplex Stainless Steel Piping Failure Investigations
CORROSION 2003, 2003Abstract In the offshore oil and gas industry, extensive use is made of corrosion resistant alloys. Two failure cases are described, one with the Cr and Mo containing nickel base alloy UNS N07718 and one with the 22%Cr duplex stainless steel UNS S31803.
S. Huizinga +3 more
openaire +2 more sources
SPE/ICoTA Well Intervention Conference and Exhibition, 2020
Abstract A producing well located offshore Congo was equipped with a TRSCSSV which failed to open. A velocity valve, with a stem beneath, had been installed to keep the flapper open. This condition, apart from restricting the production, was a temporary solution as defined in Eni's (the operator) well integrity policy; for this reason ...
Alessandro Mangione +11 more
openaire +2 more sources
Abstract A producing well located offshore Congo was equipped with a TRSCSSV which failed to open. A velocity valve, with a stem beneath, had been installed to keep the flapper open. This condition, apart from restricting the production, was a temporary solution as defined in Eni's (the operator) well integrity policy; for this reason ...
Alessandro Mangione +11 more
openaire +2 more sources
SPE Conference at Oman Petroleum & Energy Show
Abstract A case study review for two ultra-high sour (28% H2S) high-pressure high-temperature (HPHT) gas wells, each with a stuck gauge hanger causing the wells to be out of production for 6 years. The paper will capture best practices and lessons learned from the successful fishing job which was done after several unsuccessful fishing ...
H. Habboub +3 more
openaire +2 more sources
Abstract A case study review for two ultra-high sour (28% H2S) high-pressure high-temperature (HPHT) gas wells, each with a stuck gauge hanger causing the wells to be out of production for 6 years. The paper will capture best practices and lessons learned from the successful fishing job which was done after several unsuccessful fishing ...
H. Habboub +3 more
openaire +2 more sources
Reliable High Power ESP Tubing Hanger Connector Systems for Deepwater Downhole Applications
Offshore Technology Conference, 2013Abstract Electrical Submersible Pumps (ESPs) play a major role when it comes to artificial lift in deepwater reservoirs. Reliability of subsea equipment is an indispensable requirement in deepwater applications due to the high cost of interventions.
Sami Spahi, Pamela Parsley
openaire +2 more sources

