Results 71 to 80 of about 4,123 (173)

Tule Lake Evacuee Reception Center - Addition To Administration Building

open access: yes, 1942
Plan of Addition to Administration Building, Section Thru. Vault A-A, Metal Shutter Guide, and Section Thru. Vault Showing Vent Duct. Addition includes toilets for men and women.Sheet 23 of 44. Scale: As shown.
Submitted: Wm. B. Hopper, Engineering Aide; Approved: K.S. Wilkes, Capt. Corps of Engineers   +1 more
core  

Tule Lake Evacuee Reception Center - Details-Hospital Buildings

open access: yes, 1942
Details-Hospital Buildings includes eave, footing, pier, window, door jamb, heading, corner, screen door sectionsSheet 37 of 44. Scale: As shown.
Designed: K.G.W.; Checked, W.F.M.; Drawn: W.T.I Traced: W.T.I.   +1 more
core  

Tule Lake Evacuee Reception Center - Spur Warehouse & SD-17 Shed

open access: yes, 1942
Floor Plan Revised Motor Vehicle Shed, Retaining Wall Detail, Elevation Interior Bracing Door Post, Floor & Foundation Plan SPUR Warehouse, Section A-A, and Section B-BSheet 29 of 44. Scale: As shown.
Submitted: Wm. B. Hopper, Engineering Aide; Approved: K.S. Wilkes, Capt. Corps of Engineers   +1 more
core  

Lake margin depositional systems of the Dockum Group (Upper Triassic) in Tule Canyon, Texas Panhandle

open access: yes, 1979
The Dockum Group (Upper Triassic) in the Tule Canyon area is a complex assemblage of terriginous clastic rocks deposited within a broad, shallow intracratonic basin. Lakes were present in the basin through most of Dockum time. Lacustrine character is suggested by faunal content, lithofacies and evidence of rapid changes in base level.
openaire   +2 more sources

Tule Lake Evacuee Reception Center - Well Pump Houses & Sentry Towers

open access: yes, 1942
Well Pump Houses & Sentry Towers includes section, floor plan, hipped roof plan, and other details for Pumphouse at Waterwells at scale 1/2 in = 1 ft; fully detailed plan for sentry or guard tower.Sheet 38 of 44. Scale: As shown. File 97, Div 16, Project
Submitted: Wm. B. Hopper, Engineering Aide; Approved: K.S. Wilkes, Capt. Corps of Engineers   +1 more
core  

Tule Lake Evacuee Reception Center - Details-Buildings with Siding

open access: yes, 1942
Details-Buildings with Siding for corners, door jambs, gable ends, and sills with one vertical wall sectionSheet 35 of 44. Scale: As shown.
Designed: K.G.W.; Checked, W.F.M.; Drawn: W.T.I Traced: W.T.I.   +1 more
core  

Tule Lake Evacuee Reception Center - Motor Repair Shop ~ M.P.A

open access: yes, 1942
Plan of M.P. Motor Repair Shop, Floor framing plan and concrete floor details. Concrete Floor Sections, A-A, B-BSheet 22 of 44. Scale: As shown.
Submitted: Wm. B. Hopper, Engineering Aide; Approved: K.S. Wilkes, Capt. Corps of Engineers   +1 more
core  

Resistance of Mycorrhizal Cinnamomum camphora Seedlings to Salt Spray Depends on K+ and P Uptake. [PDF]

open access: yesJ Fungi (Basel), 2023
Xue L   +9 more
europepmc   +1 more source

Home - About - Disclaimer - Privacy