Results 61 to 70 of about 946 (225)
Rockburst prediction based on data preprocessing and hyperband‐RNN‐DNN
A data preprocessing workflow is proposed to address challenges in rockburst data analysis. Coupled algorithms preprocess the data set, and hyperband optimization is used to enhance RNN performance. Results show that preprocessing improves accuracy, while dense layers enhance model stability and prediction performance.
Yong Fan +4 more
wiley +1 more source
The Great Dyke of Zimbabwe is notable for its rich platinum group metal deposits but poses significant geological and geotechnical challenges due to its complex rock types and structural features. Traditional pillar design methods are insufficient for addressing these complexities; the study suggests incorporating advanced techniques such as machine ...
Tawanda Zvarivadza +3 more
wiley +1 more source
In order to effectively address the potential hazards associated with the construction of Phase II of the YE Water Supply Project’s KS tunnel in Xinjiang, this study employs the WBS-RBS (Work Breakdown Structure and Risk Breakdown Structure) method for ...
Tao Fu +4 more
doaj +1 more source
A scientometric analysis of 2449 journal articles and a comprehensive review of 336 papers were conducted, discussing and identifying challenges and research gaps in rockburst prediction and prevention and proposing an ontology‐based framework for better decision‐making in underground excavations. Abstract With underground engineering projects becoming
Hongchuan Yan +6 more
wiley +1 more source
Effect of Tunnel Progress on the Settlement of Existing Piled Foundation
Tunnel construction below or adjacent to piles will affect the performance and eventually the stability of piles due to ground deformation resulting in the movement of piles and changes in the axial force distribution along the piles. A three dimensional
Al-Omari Raid Ramzi +2 more
doaj +1 more source
This paper investigates the high‐pressure water jet‐pick combined rock‐breaking mode (HPC), which employs high‐pressure water jets to precut grooves on both sides of the picks. The rock‐breaking patterns and performance of the HPC method are obtained, and the auxiliary rock‐breaking mechanism of water jet grooving is revealed.
Jingjing Lu +6 more
wiley +1 more source
Tracking of horizontal alignment of the long and large diameter uncharged hole in NATM tunnel
The long and large diameter uncharged hole boring (LLB) method is a cut blasting method that minimizes blast-induced vibrations by creating long and large diameter uncharged holes at the excavation face of tunnels prior to tunnel excavation.
Min-Seong Kim, Sean Seungwon Lee
doaj +1 more source
Utilizing Tunnel Boring Machine (TBM)-Crushed Limestone as a Construction Material. [PDF]
Alnuaim A, Al-Mahbashi AM, Dafalla M.
europepmc +1 more source
This study investigates ground subsidence during tunnel excavation in karst areas, highlighting the combined effects of karst cave proximity, cave size, and soil spatial variability. Findings suggest that shorter cave distances and larger cave sizes increase subsidence variability, and a modified Peck formula is proposed for more accurate subsidence ...
Zhenghong Su +4 more
wiley +1 more source
Research on the Attitude Control Strategy of TBM Digging with V-Shaped Propulsion System
To address the challenges in controlling a Tunnel Boring Machine (TBM) equipped with a V-type propulsion system during excavation, a digging attitude control strategy based on a nonlinear controller is introduced.
Huabei Wang +4 more
doaj +1 more source

