Results 271 to 280 of about 124,244 (302)
Some of the next articles are maybe not open access.
IEEE Systems Journal, 2020
The optimal generation scheduling of combined heat and power units aims to minimize total cost of generation units satisfying power and heat demands.The combined heat and power economic dispatch problem should be solved considering a series of electrical and operational constraints, which will be more complicated considering valve-point effects of ...
Mohammad Moradi-Dalvand +4 more
openaire +1 more source
The optimal generation scheduling of combined heat and power units aims to minimize total cost of generation units satisfying power and heat demands.The combined heat and power economic dispatch problem should be solved considering a series of electrical and operational constraints, which will be more complicated considering valve-point effects of ...
Mohammad Moradi-Dalvand +4 more
openaire +1 more source
An Illustrative Survey of Existing Approaches in Stochastic Two-Stage Programming
1992As mentioned in chapter I the formulation of stochastic programming problems goes back to the mid 50s (Dantzig, Beale, Tintner). Since then a lot of research activities have resulted in developments of approaches for solving these problems. We intend next to focus on some of existing approaches and outline their main characteristica.
openaire +1 more source
Second order cone programming approach to two-stage network data envelopment analysis
European Journal of Operational Research, 2017zbMATH Open Web Interface contents unavailable due to conflicting licenses.
Kun Chen, Joe Zhu
openaire +1 more source
A Two-stage Stochastic Programming Approach for the Traveling Salesman Problem
Proceedings of 5th the International Conference on Operations Research and Enterprise Systems, 2016Pablo Adasme +3 more
openaire +3 more sources
Operations Research, 2015
We study the problem of integrated staffing and scheduling under demand uncertainty. This problem is formulated as a two-stage stochastic integer program with mixed-integer recourse. The here-and-now decision is to find initial staffing levels and schedules.
Kibaek Kim, Sanjay Mehrotra
openaire +1 more source
We study the problem of integrated staffing and scheduling under demand uncertainty. This problem is formulated as a two-stage stochastic integer program with mixed-integer recourse. The here-and-now decision is to find initial staffing levels and schedules.
Kibaek Kim, Sanjay Mehrotra
openaire +1 more source
A compromise programming approach for cross efficiency measurement in basic two-stage network system
Expert Systems with ApplicationsData envelopment analysis (DEA) is a technique that allows each decision-making unit (DMU) to calculate efficiency using the most favorable weights for inputs and outputs. The resulting efficiency scores are incomparable and difficult to discriminate. Cross-efficiency is a concept for solving the problem of incomparability among the efficiencies of a ...
Maryam Masoumi Hazhir +1 more
openaire +1 more source
MANAGING UNCERTAINTY IN AGRICULTURAL PRODUCTION: A TWO-STAGE STOCHASTIC PROGRAMMING APPROACH
2023Major, Australian ...
openaire +1 more source
COOPERATIVE TWO-STAGE NETWORK DEA: A GOAL PROGRAMMING APPROACH
In this study, we present a two-stage data envelopment analysis method dealing with eciency evaluation of decision making units with network structure. The key point of the study is that the suggested model optimizes the Black-Box and stages eciencies simultaneously with the aim of achieving the smallest possible gap between the aspiration levels.ZAHİRİ, P., MİRBOLOUKİ, M.
openaire +1 more source
A Two-stage Stochastic Programming Approach for Aircraft to Ground Resource Assignment
2024 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)Lidia Zewde +3 more
openaire +1 more source
AN INEXACT TWO-STAGE STOCHASTIC PROGRAMMING MODEL FOR WATER RESOURCES MANAGEMENT UNDER UNCERTAINTY
Civil Engineering and Environmental Systems, 2000Guohe Huang, D P Loucks
exaly

