Results 111 to 120 of about 23,666 (240)
NOC turbulence glider deployment report for the Liverpool Bay Coastal Observatory, June 2011 deployment [PDF]
A summary of the NOC Liverpool turbulence glider deployment that occurred between Tuesday 28th June and Monday 4th July 2011 is provided in this document. The general objective of the deployment was to hold the glider on station at a nominal GPS location
Balfour, C., Knight, P., McLaughlin, D.
core
Tank waste remediation system (TWRS) mission analysis [PDF]
The Tank Waste Remediation System Mission Analysis provides program level requirements and identifies system boundaries and interfaces. Measures of success appropriate to program level accomplishments are also identified.
openaire +2 more sources
TWRS information locator database system design description [PDF]
This document gives an overview and description of the Tank Waste Remediation System (TWRS) Information Locator Database (ILD)system design. The TWRS ILD system is an inventory of information used in the TWRS Systems Engineering process to represent the TWRS Technical Baseline.
openaire +2 more sources
Investigation of enhancing EDM machining performance of INCONEL alloy using composite electrodes
In this research, an attempt was made to reinforce aluminium with graphite particles and use it as a tool material with the objective of combining the properties of aluminium and graphite.
Shabarinathan KT +3 more
doaj +1 more source
Evaluation of a metering, mixing, and dispensing system for mixing polysulfide adhesive [PDF]
Tests were performed to evaluate whether a metered mixing system can mix PR-1221 polysulfide adhesive as well as or better than batch-mixed adhesive; also, to evaluate the quality of meter-mixed PR-1860 and PS-875 polysulfide adhesives.
Evans, Kurt B.
core +1 more source
Tower Temperature and Humidity Sensors (TWR) Handbook [PDF]
Three tall towers are installed at the Atmospheric Radiation Measurement (ARM) Climate Research Facility: a 60-meter triangular tower at the Southern Great Plains (SGP) Central Facility (CF), a 21-meter walkup scaffolding tower at the SGP Okmulgee forest site (E21), and a 40-meter triangular tower at the North Slope of Alaska (NSA) Barrow site.
openaire +2 more sources
Tethering sockets and wrenches [PDF]
The tethering of sockets and wrenches was accomplished to improve the safety of working over motor segments. To accomplish the tethering of the sockets to the ratchets, a special design was implemented in which a groove was machined into each socket ...
Johnson, E. P.
core +1 more source
TWRS systems engineering process and information model report [PDF]
The TWRS System Engineering (SE) process and information flows are described using a process modeling methodology. The results of this activity, and the next phase of developing a normalized data model, will be used in training and implemented in SE information systems and support tools.
openaire +2 more sources
In this investigation, electrical discharge machining (EDM) of hybrid aluminium composite (HAC) comprising AA8081, boron carbide (B4C) (10 wt.%) and graphite (Gr) (5 wt.%) is carried out.
M. Vivekanandhan +3 more
doaj +1 more source
TWRS safety and technical integration risk management plan [PDF]
The objectives of the Tank Waste Remediation System (TWRS) Safety and Technical Integration (STI) programmatic risk management program are to assess, analyze, and handle risks associated with TWRS STI responsibilities and to communicate information about the actions being taken and the results to enable decision making.
openaire +2 more sources

