Results 241 to 250 of about 358,496 (277)
Some of the next articles are maybe not open access.
CONSTRUCTION OF UNDERGROUND STORAGE CHAMBERS
Proceedings of SPE Northern Plains Section Regional Meeting, 1975Discussion of this paper is invited. Three copies of any discussion should be sent to the Society of Petroleum Engineers office. Such discussion may be presented at the above meeting and, with the paper, may be considered for publication in one of the two SPE magazines.
R.L. Loofbourow +2 more
openaire +1 more source
Challenges in underground construction
Proceedings of the Institution of Civil Engineers - Municipal Engineer, 2008Infrastructure construction in mega-cities poses great challenges. Most transportation systems, energy and water supplies, shopping facilities and other daily necessities require underground spaces. However, underground construction in soft ground is demanding and must be carefully undertaken with great attention to temporary works design ...
openaire +1 more source
Monitoring Underground Construction
2011Monitoring Underground Construction is the only guide to the principles for development, design, implementation and management of monitoring systems employed to manage risks in underground construction for clients, project managers, designers, contractors and asset owners.
openaire +1 more source
Underground Power Cable Construction
2016This chapter deals with many special features of underground power cables. Important points are presented in this chapter. In this chapter the various components of the different underground cables used in transmission and distribution of electric energy are explained. The materials used in the manufacture of these cables are given in details.
openaire +1 more source
Construction Challenges of 345kV Underground
Electrical Transmission Line and Substation Structures, 2006Burns & McDonnel is providing Program Management and detailed design for the Northeast Utilities (NUSCO) subsidiary Connecticut Light and Power (CL&P) on the Middletown/Norwalk Bulk Transmission Project, a $1.2 Billion project scheduled for completion in December, 2009.
Scott E. Newland, Michael E. Beehler
openaire +1 more source
Tunneling and Underground Construction
2014Proceedings of the Geo-Shanghai 2014 International Conference, held in Shanghai, China, May 26-28, 2014. GSP 242 contains 99 technical papers that focus on the latest developments in research and practical applications in tunneling, deep excavations, retaining structures, drilled shafts, and ground improvement.
openaire +1 more source
Risk Management for Underground Construction
2009In engineering practice, geotechnical uncertainties are often coped with by various codes and standards. However, uncertainties are not invariant for all projects and thus design and construction codes and standards do not necessarily always satisfy the requirement.
Chin C.T., Chao H.C.
openaire +1 more source
FORENSIC ENGINEERING FOR UNDERGROUND CONSTRUCTION
Rock Mechanics in Underground Construction, 2006In the context of underground construction, forensic engineering is taken to be the application of engineering principles and methodologies to determine the cause of a performance deficiency, often a collapse, in an excavation, and the reporting of the findings, usually in the form of an expert opinion within the legal system.
openaire +1 more source
Technology Innovation in Underground Construction
2009A primary focus in the technological development of underground engineering is to ease practical execution while reducing time, cost and risk in the construction and maintenance of facilities like tunnels and caverns. this can be accomplished through the use of new software tools for designers, instant data access for engineers, virtual prototyping and
openaire +1 more source

