Results 231 to 240 of about 10,404,039 (255)
Some of the next articles are maybe not open access.
CoatingsPro, 2006
Rehabilitating a wastewater facility’s concrete and steel infrastructure requires four months of hard work, 1,000 gallons of coatings - and hepatitis shots for the crew.
openaire +1 more source
Rehabilitating a wastewater facility’s concrete and steel infrastructure requires four months of hard work, 1,000 gallons of coatings - and hepatitis shots for the crew.
openaire +1 more source
Microplastics in Wastewater Treatment Plants: Occurrence, Fate and Identification
Chemical Engineering Research and Design, 2021Guleda Önkal Engin +2 more
exaly
The Design for Wastewater Treatment Plant (WWTP) With GPS X Modelling
Cogent Engineering, 2020Hamidi Abdul Aziz
exaly
Reuse of Wastewaters in Irrigation of Broad Bean and Their Effect on Plant-Aphid Interaction
Agricultural Water Management, 2021Naji Al-Mefleh
exaly
Characteristics and Interactions of Bioaerosol Microorganisms From Wastewater Treatment Plants
Journal of Hazardous Materials, 2020Tang Yang, Lin Li, Yunping Han
exaly
Effect of Aeration Mode on Aerosol Characteristics From the Same Wastewater Treatment Plant
Water Research, 2020Tang Yang, Xu Yan, Lin Li
exaly
Occurrence, Transformation, and Fate of Antibiotics in Municipal Wastewater Treatment Plants
Critical Reviews in Environmental Science and Technology, 2011Bing Li, Tong Zhang
exaly

