Results 261 to 270 of about 722,593 (299)

Measuring Progress in Sanitation

open access: yes, 2010
Bjerre, J   +4 more
core  

Engineering Calculations of Acidifier Retaining Walls During Water Treatment Facilities Designing

Lecture Notes in Civil Engineering, 2022
Vladimir Rimshin   +2 more
exaly   +2 more sources

Treatment of furazolidone contaminated water using banana pseudostem biochar engineered with facile synthesized magnetic nanocomposites

Bioresource Technology, 2020
The present study enlightens facile synthesis and characterization of magnetic biochar derived from waste banana pseudostem biomass for the removal of nitrofuran antibiotic 'furazolidone' (FZD). Brunauer-Emmett-Teller (BET), scanning electron microscopy (SEM), magnetic hysteresis, X-ray diffraction (XRD), and Fourier transform infrared spectroscopy ...
Ranjit Gurav   +13 more
openaire   +2 more sources

Produced Water Management - Reservoir and Facilities Engineering Aspects

Proceedings of Middle East Oil Show and Conference, 1999
Abstract Produced water management via injection, to disposal zones or re-injected into the source oil zone (PWRI), is being increasingly regarded as the best practicable environmental option - far preferable to discharge to the sea or evaporation ponds in the desert.
P. Evans, K. Robinson
openaire   +1 more source

A facile method to functionalize engineering solid membrane supports for rapid and efficient oil–water separation

Polymer, 2013
A facile and low-cost method is developed to functionalize engineering metal membrane supports, such as stainless steel (SS), with epoxy-containing polymer poly(glycidyl methacrylate) (PGMA) to produce a versatile and universal platform for subsequent surface modification.
Benxin Jing   +5 more
openaire   +1 more source

Engineering examination as the basis for the successful reconstruction of natural and waste water treatment facilities

Vodosnabzhenie i sanitarnaia tehnika, 2021
При эксплуатации сооружений очистки природных и сточных вод могут изменяться условия относительно принятых в проектных решениях. Вследствие этого очистные сооружения прекращают выполнять возложенные на них функции. До реконструкции таких сооружений водоподготовки и очистки сточных вод инженерно-техническое обследование является основой принятия верных ...
openaire   +1 more source

CFD Analysis of Water Cooled Flame Deflector in Rocket Engine Test Facility

2016
The flame deflector of a rocket engine test facility needs to be protected from the high thermal loads resulting from the impingement of high velocity and high temperature exhaust flame on it during the hot test. The flame deflector is cooled by water injected from holes in the deflector plate.
null Anant Singhal   +2 more
openaire   +1 more source

Hydrogen production using thermochemical water-splitting Iodine–Sulfur process test facility made of industrial structural materials: Engineering solutions to prevent iodine precipitation

International Journal of Hydrogen Energy, 2021
Abstract A thermochemical water-splitting iodine–sulfur process offers the potential for mass-producing hydrogen at high-efficiency levels, and it uses high-temperature heat sources, including high-temperature gas-cooled reactors, solar heat, and waste heat of industries.
Noguchi Hiroki   +8 more
openaire   +1 more source

Home - About - Disclaimer - Privacy