Results 41 to 50 of about 559 (139)

Analyzing Waterflood Project

open access: yes
This chapter analyses a waterflood project, where recoverable oil must be estimated, and one of four production schedules is used to generate a revenue stream. The model combines volumetric estimates, prices, costs, and production scheduling. The overall objective is to estimate the internal rate of return (IRR) for the project over an 18-year horizon,
openaire   +1 more source

Home - About - Disclaimer - Privacy