Results 11 to 20 of about 828,080 (265)
The article presents the results of analysing geological structure of the Famennian deposits (Devonian) in the Perm Region. Numerical modelling of the distribution of inhomogeneous stress field near the well was performed for the two considered types of ...
Sergey E. Chernyshov +5 more
doaj +1 more source
System solution for technological problems of well construction completion. [PDF]
The paper highlights the factors impeding the technology of well cementing in the well construction process, summarizes the indicators and problems of casing cementing job quality.
POLYAKOV Vladimir Nikolayevich +5 more
doaj +1 more source
A Workflow for Optimization of Flow Control Devices in SAGD
In McMurray Formation, steam assisted gravity drainage is used as the primary in-situ recovery technique to recover oil sands. Different geological reservoir settings and long horizontal wells impose limitations and operational challenges on the ...
Anas Sidahmed +2 more
doaj +1 more source
Selective Water Plugging Technology for Horizontal Well with Screen Completion
The SD107 gel system developed has good oil–water phase selective gelation and oil–water phase selective blocking properties. The static gel-forming experiment results showed that the gel water shutoff system formulated with oilfield reinjection water ...
Bo Deng +7 more
doaj +1 more source
Data-Driven Proxy Models for Improving Advanced Well Completion Design under Uncertainty
In order to improve the design of advanced wells, the performance of such wells needs to be carefully assessed by taking the reservoir uncertainties into account.
Ali Moradi +2 more
doaj +1 more source
A selection method of the horizontal wells completion [PDF]
The completion of horizontal wells can be done by different ways and depends on production constraints and the reservoir characteristics.The selection of a completon method is directly influenced by the degree of rock consolidation, the need for water or
Ivica Ristović +2 more
doaj
Efficiency evaluation for nanomaterials applied in well bottom zone treatment after completion of well construction [PDF]
Efficient development of low production wells is not possible without the bottom zone treatment, both during the well development phase when its construction is completed and in the process of flow rate reduction during the operation phase.
GREZINA Olga Anatolyevna,
doaj +1 more source
Structure Optimization for High-Temperature High-Pressure Well Completion
According to the operational requirements of ultra-deep, ultra-high-pressure and ultra-high-temperature wells in Shunbei oil and gas field,a mechanically retrievable test packer suitable for the 139.7 mm(5 1/2 in)casing was designed, with the inside ...
Wang Long
doaj
Sustained Casing Pressure (SCP) is the persistent casinghead pressure resulting from the well’s annular integrity loss and migration of gas above the leaking cement sheath.
Efecan Demirci, Andrew Wojtanowicz
doaj +1 more source
Protection of hotwater line of geothermal water from wells GTD-1,2,3 in Ďurkov [PDF]
The geothermal energy nowadays belongs to the most interesting, renewable, progressive and ecologically pure energies. Its utilization began long ago, but because the development and exploration show that fossil fuels are depletable in 40 – 50 years, it ...
Gabriel Wittenberger
doaj

