Summary report no. 3, December 1947 [PDF]
Includes: foreword, Project Whirlwind, the Whirlwind computers, and reports; general status, time schedules, Whirlwind II, Whirlwind I, and visitors; system design and timing studies; circuits and flip-flops; standardization of circuits; storage tubes ...
Project Whirlwind Research Staff
core
Summary report no. 30, second quarter, 1952 [PDF]
Includes: foreword; quarterly review (and abstract); operation of Whirlwind I, terminal equipment, and power supplies; circuits and components, vacuum tubes and component replacements in WWI; mathematics, coding, and applications, problems being solved ...
Project Whirlwind Research Staff
core
Summary report no. 18, March 1949 [PDF]
Includes: foreword; quarterly review; installation and testing of WWI; control, electrostatic storage control, and in-out control; summary schedule; storage tubes, spots on storage surface and storage tube life tester; vacuum tube life; visitors ...
Project Whirlwind Research Staff
core
Summary report no. 17, February 1949 [PDF]
Includes: foreword; general status; installation and testing of WWI; summary schedule; life of vacuum tubes in pulsed circuits; the Whirlwind electrostatic storage tube; checking and trouble location, formation of committee, test problems, and marginal ...
Project Whirlwind Research Staff
core
Summary report no. 3, December 1947 [PDF]
Includes: foreword, Project Whirlwind, the Whirlwind computers, and reports; general status, time schedules, Whirlwind II, Whirlwind I, and visitors; system design, timing studies; circuits, flip-flops; standardization of circuits; storage tubes, storage
Project Whirlwind Research Staff
core
Summary report no. 36, fourth quarter, 1953 [PDF]
Includes: foreword; quarterly review and abstract; mathematics, coding, and applications, introduction, and problems being solved; operation of Whirlwind I, systems engineering, and input-output system; circuits and components, vacuum tubes, and ...
Project Whirlwind Research Staff
core
Summary report no. 16, January 1949 [PDF]
Includes: foreword; general status; installation and testing of WWI; summary schedule; storage tube reliability tester; flip-flop development, low-speed analogue of flip-flop, D-C flip-flop for D-C load coupling, and A-C flip-flop; mathematics: coding of
Project Whirlwind Research Staff
core
Summary report no. 31, third quarter, 1952 [PDF]
Includes: foreword; quarterly review (and abstract); operation of Whirlwind I, shutdown and modification of computer, and systems engineering; circuits and components, vacuum tubes, storage-tube life, and component replacements in WWI; mathematics ...
Project Whirlwind Research Staff
core
Summary report no. 37, first quarter 1954 [PDF]
Includes: foreword; quarterly review and abstract; mathematics, coding, and applications, introduction, and problems being solved; operation of Whirlwind I, systems engineering, and input-output system; circuits and components, vacuum tubes, and ...
Project Whirlwind Research Staff
core
Summary report no. 38, second quarter 1954 [PDF]
Includes: foreword; quarterly review and abstract; mathematics, coding, and applications, introduction, problems being solved, and tape-preparation statistics; operation of Whirlwind I, systems engineering, and input-output system; circuits and ...
Project Whirlwind Research Staff
core