Results 61 to 70 of about 22,304,143 (101)
Summary report no. 38, second quarter 1954 [PDF]
Includes: foreword; quarterly review and abstract; mathematics, coding, and applications, introduction, problems being solved, and tape-preparation statistics; operation of Whirlwind I, systems engineering, and input-output system; circuits and ...
Project Whirlwind Research Staff
core
Summary report no. 32, fourth quarter, 1952 [PDF]
Includes: foreword; quarterly review (and abstract); operation of Whirlwind I, test control, in-out system, and electrostatic storage; circuits and components, vacuum tubes and component replacements in WWI; mathematics, coding, and applications ...
Project Whirlwind Research Staff
core
Whirlwind I Trouble Shooting, Comments on Memorandum M-123
Comments on Memorandum M-123 from Jay Forrester on Whirlwind I Trouble ...
Forrester, Jay W.
core
Summary report no. 37, first quarter 1954 [PDF]
Includes: foreword; quarterly review and abstract; mathematics, coding, and applications, introduction, and problems being solved; operation of Whirlwind I, systems engineering, and input-output system; circuits and components, vacuum tubes, and ...
Project Whirlwind Research Staff
core
Barta Visitors #5, June 4, 1951 - December 3, 1951
Information logged: date, name (signature), name (printed), firm represented, visiting, in, out, authorized by, badge no."List of visitors to Whirlwind, May 25, 1951... from Project Charles and MIT... from USAF - Washington" - p.1 of PDFLog book tracking
Project Whirlwind consultants
core
Rani-Henrik Andersson's A Whirlwind Passed Through Our Country: Lakota Voices of the Ghost Dance
Tiffany Hale
doaj +1 more source
Summary report no. 2, volume 12, input and output, part II
Includes memos M-146, a thesis, and R-129."There are three general types of input and output equipment required for Whirlwind I. They are: a) numerical, b) mechanical and electrical, and c) graphical"Includes block diagrams, figures, and photographs ...
Project Whirlwind Research Staff
core
Summary report no. 20, third quarter, 1949 [PDF]
Includes: foreword; quarterly review, summary schedule July 1949-June 1950; system engineering, installation and testing of WWI, Whirlwind I operation with control and test storage; circuits and components, five-digit multiplier, vacuum tube life, and ...
Project Whirlwind Research Staff
core
Summary report no. 2, volume 7, block diagrams, part III
Includes memos M-141, M-137, M-134, M-111, M-113, M-123, M-127, M-161, M-129, M-117, M-135, M-136, M-158, and E-24.Includes block diagrams.Part 3 of an in-depth review of Whirlwind I computer block diagrams, compiling Project Whirlwind memos regarding ...
Project Whirlwind Research Staff
core
Summary report no. 2, volume 20, iconoscope studies [PDF]
Includes memo M-154 and a thesis.Compilation of Project Whirlwind memos regarding iconoscope ...
Project Whirlwind Research Staff
core

